Filter Search


Transportation


Location Summary Deadline
India Faecal Sludge Treatment Plant For Dalmau Town Ward No. 01 To 10 Dist Raebareli Of Uttar Pradesh Which Comprises Of Construction Of Faecal Sludge Treatment Plant 08 Kld Collection And Transportation Systems Of Septage From Household To Fstp 2025-07-28
India Top Housing .#* Top Housing To Drg No. Aal-021101/n, Alt -1, Item No. 1 Along With Pu Lining, It em No. 4, For Poly Urethane Side Bearer Pad For Nlb Bogies. Specn: Wd-38-misc-2004, Rev-3 of April 2025. [ Warranty Period: 30 Months After The Date Of Delive 2025-07-28
India Emus Drivers Cab Foot Step .#* Emus Drivers Cab Foot Step Arrangement To Drawing Noicf/mrvc/m/bt-2-4-001 col.-1 Alt A. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-28
India Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner (hvn Liner) To rdso Drg. No. T-8751. .#* Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner (hvn Liner) To Drg. No. R dso/t-8751 Alteration-3 With Latest Alteration For Use 2025-07-28
India Sand Box Assembly (lh, Rh & Duel) .#* Sand Box Assembly (lh, Rh & Duel) For Wap5 Locos As Per Clw Spec No ? Clw/ms/10/038 A t -4 And Drg No 1210-07.138.003 Alt -2, 1210-07.138.002 Alt -2, 1210-07.138.004 Alt -1 And 1210-07.138.0 05 Alt -1. Note - Material 2025-07-28
India Welding Leather Apron .#* Welding Leather Apron Made Of High Quality Split Leather For Protection Of Body Of Welders Du ring Welding And Oxy Cutting. Specification: - As Per Annexure Attached. [ Warranty Period: 6 Months Afte r The Date Of Delivery ] ] 2025-07-28
India One Coach Set Of Control Arm .#* One Coach Set Of (1) Control Arm Lower Right To Drg No.aaa02028 Alt D - 4 nos. (2) Control Arm Lower Left To Drg No. Aaa02027 Alt D - 4 Nos. (3) Contorl Arm Upper to Drg No Aaa02026 Alt J - 8 Nos. (these Three Items Form O 2025-07-28
India Supply,installation & Commissioning Of Eot Crane 5 Ton Etc. .#* Supply,installation & Commissioning Of Eot Crane 5 Ton (as Per Attached Technical Specificat ion) [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-28
India Kit Of Spares For Tapchanger Contactor Cylinder Assembly As Per annexure Attached ( Comprising Of 21 Items)for Emu/memu .#* Kit Of Spares For Tapchanger Contactor Cylinder Assembly As Per Annexure attached ( Comprising Of 21 Items)for Emu/memu.specificati 2025-07-28
India Construction Of C.c. Road Work At Prathamik Vidhyalay To Kamal Singh Ka Pura Zone 25.ward No.66 File No.202/25x3/6. 2025-07-28
Whats app