Filter Search


Transportation


Location Summary Deadline
-Construction-Work-Of-A-Drain-And-Cement-Concrete-Road-From-The-House-Of-Ward-No.-04-Mao-Shivpuri-Umashankar-To-The-House-Of-Tampi-Mistri-And-From-Puran-To-The-House-Of-Omprakash.>India -Construction-Work-Of-A-Drain-And-Cement-Concrete-Road-From-The-House-Of-Ward-No.-04-Mao-Shivpuri-Umashankar-To-The-House-Of-Tampi-Mistri-And-From-Puran-To-The-House-Of-Omprakash.>Work_no_4
Construction Work Of A Drain And Cement Concrete Road From The House Of Ward No. 04 Mao Shivpuri Umashankar To The House Of Tampi Mistri And From Puran To The House Of Omprakash.
-Construction-Work-Of-A-Drain-And-Cement-Concrete-Road-From-The-House-Of-Ward-No.-04-Mao-Shivpuri-Umashankar-To-The-House-Of-Tampi-Mistri-And-From-Puran-To-The-House-Of-Omprakash.>2026-01-08
-Ward-No.-11,-Construction-Work-Of-Drain-And-Cement-Concrete-Road-From-Holi-Chowk-To-Pappan-House-At-Mau-Holi-Gate.>India -Ward-No.-11,-Construction-Work-Of-Drain-And-Cement-Concrete-Road-From-Holi-Chowk-To-Pappan-House-At-Mau-Holi-Gate.>Work_no_5
Ward No. 11, Construction Work Of Drain And Cement Concrete Road From Holi Chowk To Pappan House At Mau Holi Gate.
-Ward-No.-11,-Construction-Work-Of-Drain-And-Cement-Concrete-Road-From-Holi-Chowk-To-Pappan-House-At-Mau-Holi-Gate.>2026-01-08
-Construction-Work-Of-A-Drain-And-Cement-Concrete-Road-From-The-Well-At-Ward-No.-11,-Mau-Holi-Darwaza,-To-Bindu-House.>India -Construction-Work-Of-A-Drain-And-Cement-Concrete-Road-From-The-Well-At-Ward-No.-11,-Mau-Holi-Darwaza,-To-Bindu-House.>Work_no_6
Construction Work Of A Drain And Cement Concrete Road From The Well At Ward No. 11, Mau Holi Darwaza, To Bindu House.
-Construction-Work-Of-A-Drain-And-Cement-Concrete-Road-From-The-Well-At-Ward-No.-11,-Mau-Holi-Darwaza,-To-Bindu-House.>2026-01-08
India Door-to-door Garbage Collection, Open Spot Garbage Collection And Transporting All These Waste To Dumping Site, Sweeping Of Commercial And Residential Area In Municipality & Night Safai Etc. 2026-01-08
India Rfp For Selection Of Agency For Operation And Management Of Schools For Pmc 2026-01-08
India Miscellaneous Road Safety Work At Biom Kirandul Complex 2026-01-08
-Design,-Engineering,-Manufacture,-Procurement-Of-Materials-And-Bought-Out-Components,-Assembly-At-Shop,-Inspection-Including-Inspection-By-Tpia,-Testing-(factory-Acceptance-Test),-Packing,-Transportation-And-Su>India -Design,-Engineering,-Manufacture,-Procurement-Of-Materials-And-Bought-Out-Components,-Assembly-At-Shop,-Inspection-Including-Inspection-By-Tpia,-Testing-(factory-Acceptance-Test),-Packing,-Transportation-And-Su>Supply Of Cs Drums Upto 25mm Thickness
Design, Engineering, Manufacture, Procurement Of Materials And Bought Out Components, Assembly At Shop, Inspection Including Inspection By Tpia, Testing (factory Acceptance Test), Packing, Transportation And Su
-Design,-Engineering,-Manufacture,-Procurement-Of-Materials-And-Bought-Out-Components,-Assembly-At-Shop,-Inspection-Including-Inspection-By-Tpia,-Testing-(factory-Acceptance-Test),-Packing,-Transportation-And-Su>2026-01-08
-Improvement-Of-Road-Surface-At-116d-Sarat-Ghosh-Garden-Road-Etc.-In-Ward-No-91,-Br-x>India -Improvement-Of-Road-Surface-At-116d-Sarat-Ghosh-Garden-Road-Etc.-In-Ward-No-91,-Br-x>X/091/033/2025-2026
Improvement Of Road Surface At 116d Sarat Ghosh Garden Road Etc. In Ward No-91, Br-x
-Improvement-Of-Road-Surface-At-116d-Sarat-Ghosh-Garden-Road-Etc.-In-Ward-No-91,-Br-x>2026-01-08
India Main Compressor Complete Assembly With Driving Motor Mcp .#* Main Compressor Complete Assembly With Driving Motor Mcp (make: Abb, Crompton, B bl) For Conventional Electric Locos, 1000 Lpm As Per Clws Spec. No. Clw/es/oc-34, Alt-o Including L atest Ms/tc I 2026-01-08
India Canvas Aprons Olivegreen .#* Canvas Aprons As Per Specification Mcf-rbl-68-001 Is Attached Herewith (pil ot Sample To Be Approved By Consignee Before Bulk Supply). [ Warranty Period: 30 Months after The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age 2026-01-08
Whats app