Filter Search


Transportation


Location Summary Deadline
India Sampling, Analysis And Supervision Work During Canalisation Of Bsm From East Coast 2026-01-08
India Sampling, Analysis And Supervision Work During Canalisation From West Coast 2026-01-08
-Special-Repair-Through-Short-Term-Maintenance-Contract-On-Mungiakami-Champaknagar-Road-Section-In-Various-Stretches-From-Km-422.000-To-Km-423.000,-Km-436.700-To-Km-437.500,-Km-437.750-To-Km-438.000,-Km-438.340-T>India -Special-Repair-Through-Short-Term-Maintenance-Contract-On-Mungiakami-Champaknagar-Road-Section-In-Various-Stretches-From-Km-422.000-To-Km-423.000,-Km-436.700-To-Km-437.500,-Km-437.750-To-Km-438.000,-Km-438.340-T>Nhidcl/ro-agt/t/sr/mu- Ch/2025 26/770
Special Repair Through Short Term Maintenance Contract On Mungiakami Champaknagar Road Section In Various Stretches From Km 422.000 To Km 423.000, Km 436.700 To Km 437.500, Km 437.750 To Km 438.000, Km 438.340 T
-Special-Repair-Through-Short-Term-Maintenance-Contract-On-Mungiakami-Champaknagar-Road-Section-In-Various-Stretches-From-Km-422.000-To-Km-423.000,-Km-436.700-To-Km-437.500,-Km-437.750-To-Km-438.000,-Km-438.340-T>2026-01-08
India Hrn Landolts Split C Ring Board Test .#* Ishiharas Colour Vision Chart Test Book Consist Of 38 Plates Complete With Key Original Ja pan Make Latest Edition -2023 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-08
India Interlocking Work Is Being Carried Out At Ramlila Maidan In Mohalla Nai Abadi, On The Connecting Road From Shahganj Tehsil To The Pwd Dak Bungalow. 2026-01-08
India Interlocking Work From The Railway Crossing Road To Tulsi Udyan Park In Ramlila Maidan, Mohalla Nai Abadi. 2026-01-08
India Procurement Of Backpack Battery Operated Vacuum Garbage Litter Collector .#* Backpack Battery Operated Vacuum Garbage Litter Collector . Suction Hose Length -2mtr, Cont ainer Capacity-35-liter, Intake Hose Dia.75mm, Warranty Minimum- 2.5year, Details Spec 2026-01-08
India Selection Of An Agency For Day To Day Operation And Maintenance Of Horticulture And Landscaping Area At Atal Path Mr 02 Road Abd Green Plots Smart Park Phase 01 Phase 2 Ladli Laxmi Path Road(depo Sq To Polytechnic Sq) Etc For The Period Of 06 Month 2026-01-08
India 1.coupler Rod For Bvzi Wagon 2.safety Strap For Inner & Outer 3.carrier Sub assembly .#* Coupler Rod For Bvzi Wagon As Per Drg.no. Wd-81035-s-17, Alt-3 Or Latest, Item No. 01 [ Wa rranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-08
India Set Of Luggage Rack Modules .#* Set Of Luggage Rack Modules For Lhb Non Ac Chair Car Coaches As Per Drawing No. lj62107 Alt A. Item -1, Of Length 2195mm. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-08
Whats app