Filter Search


Transportation


Location Summary Deadline
India Microprocessor Based Electronic Speed-cum-energy Monitoring System .#* Microprocessor Based Electronic Speed-cum-energy Monitoring System Conforming To Rds o Specn. No. Elrs/spec/spm/0002, Rev-4 For 3-phase Electric Locomotive. Set Consists Of 03 Items In 2026-04-03
India Air Spring (vande Bharat) .#* One Coach Set (consisting 04 Nos.) Of Air Spring Assembly (160.8 Kn Capacity) As Per M/s gmt Drg No. 17308901, Index 005, Colour - Grey Or Any Other Firms Drawing Accepted/approved By Rd so For Vb-2 Coaches Conforming To Rdso 2026-04-03
India Entering Into Rate Contracts & Empanelment Of Agencies In Respect To Hiring Of services Of Attendants On Man Days Basis For Attachment To Officers Of Scor Head quarters 2026-04-03
India Railway Electrification Work For Design, Supply, Erection, Testing And Commissioning Of 25 Kv, 50 Hz, Single Phase electrification Works (ohe, Tss, Scada Works) In Electric Loco Trip Shed, Lumding (0.00rkm/1.50tkm). 2026-04-03
India Vadodara Division :- Construction Of Road Under Bridges In Lieu Of Elimination Of 12 number Of Level Crossings (anand-khambat Section: Lc No. 34, 36, 41, 41x, 45 and Nadiad - Kapadvanj Section : Lc No. 14, 18, 28, 38, 41, 42, 47). 2026-04-03
India Provision Of At Supply For Intermediate Block Signalling (ibs) Huts At Cru, Pau, mql, Lbg And Pbn In Mue-pbn Section In Nanded Division -electrical arrangements. 2026-04-03
India The Project Involves The Installation And Provision Of Infrastructure For A Customized Shared In-building Solution (ibs) To Cellular Operators At The Airports Authority Of India''''s Corporate Headquarters. This Includes Setting Up Necessary Equipment And 2026-04-03
India Supply, Installation, Testing And Commissioning Of Yard Cctv Surveillance System over 8 Nos. Of Stations (bksc A Cabin, Bksc N Cabin, Drgu, Jsw, Rui, Sona, bwcn & Bbda) In Adra Division. 2026-04-03
India Supply, Laying, Testing And Commissioning Of 600 M Long, 25 Mm Dia Heavy Duty seamless Pipe Pneumatic Pipeline (pressure Capacity 10 Kg/cm²) With Complete arrangement For Sctr Testing Of Lhb & Vande Bharat Coaches At New Coaching complex, Asansol, In Conn 2026-04-03
India Shifting Of Eppfs Pressurizer Unit From Under Slung To Onboard Mounting In Lhb coaches At C&w Depot Chandigarh 2026-04-03
Whats app