Filter Search


Transportation


Location Summary Deadline
India Construction Of A Concrete Road From Manik Soms House To Nirmal Mondals House Sansad-26 , Booth No-28 (scheme Id-apas/01/151/28/0003 2025-11-20
India Construction Of A Concrete Road From Shashi Guptas House To Dharmendra Prasads House Sansad-26 , Booth No-28 (scheme Id- Apas/01/151/28/0004) 2025-11-20
India Construction Of A Concrete Road From Debu Haldars House To Debangshu Mondals House Sansad-24 , Booth No-26 (scheme Id-apas/01/151/26/0001) 2025-11-20
India Construction Of A Concrete Road With Piling From Pancha Mondals House To Kalipada Dalu S House Sansad-25 , Booth No-27 (scheme Id- Apas/01/151/27/0001) 2025-11-20
India Plastic Caps To Be Provided At The Pipe Connections After Inspection & Testing. The Caps Should Bear The Size Of Bsp Threads Marked On Them. Working Pressure - 150 Psi, Test Pressure 160 Psi. Parcolubrite Treatment To Be Done On Ferrous Castings As Per Sp 2025-11-20
Germany Retrofitting Street Lighting Market 2025-11-20
Netherlands 31204156 2025-11-20
India P U Pad For Arm Rest Of Lhb Chair Car Spec: Drg. No. Judw/mech/11-618, Item-2 colour- Green .#* P U Pad For Arm Rest Of Lhb Chair Car Spec: Drg. No. Judw/mech/11-618, Item-2 colour- Green [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity 2025-11-20
Germany Civil Engineering, Electrical And Cable Structure Work For Street Lighting And Traffic Light Systems 2025-11-20
Czech Republic Smv S3 Spec 5501_6 2025-11-20
Whats app