Filter Search


Transportation


Location Summary Deadline
India Supply Of Bare Pump - Model: Um-2 Size Nb 80 X Nb 80 - 8250 Lph, 2 Kgf/cm2 Without Base Frame Motor Of Cl, Bush With Bush Block Of Clean Oil Pump, Type-um-2, Drive Driven Gear With Shaft In Assembled Condition Of Clean Oil Pump, Type-um-2, Mechanical Seal 2024-10-25
-Ss-Lav-Inlay-For-Lhb-Ac-Coaches-Along-With-Supporting-Structure-For-Pan-(-L.h-)-Consisting-Of-Item-No.-1-&-3-Of-Drg-No.-Llh---34/2024.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Ss-Lav-Inlay-For-Lhb-Ac-Coaches-Along-With-Supporting-Structure-For-Pan-(-L.h-)-Consisting-Of-Item-No.-1-&-3-Of-Drg-No.-Llh---34/2024.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Ss Lav Inlay For Lhb Ac Coaches
Ss Lav Inlay For Lhb Ac Coaches Along With Supporting Structure For Pan ( L.h ) Consisting Of Item No. 1 & 3 Of Drg No. Llh - 34/2024. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Ss-Lav-Inlay-For-Lhb-Ac-Coaches-Along-With-Supporting-Structure-For-Pan-(-L.h-)-Consisting-Of-Item-No.-1-&-3-Of-Drg-No.-Llh---34/2024.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-25
India Additional Work Of Concrete Road And Bituminous Road Restoration Laying Of Ms Pipe Fhtc Land Development Of H/w Site Drain And Internal Path Way Concrete Road And Bitumious Road Restoration Laying Of Ms Pipe And Necessary Allied Works Of Under Jalkan 2024-10-25
India Integrated Solid Waste Management I.e. Sweeping/cleaning Of Roads, Streets, Drains, Door To Door Collection, Transportation, Processing And Disposal Of Municipal Solid Waste, And Operational Processing Plant At Trenching Ground. 2024-10-25
India Balance Work For Krishnarampur Piped W/s Scheme ,construction Of Boundary Walls With Gates And Land Development Drain And Internal Pathway Etc At 3rd Pump House Site And Fhtc Work Under Galsi-i ,purba Bardhaman 2024-10-25
-Push-Fitting-Consisting-Of-04-Items-As-Per-Annexure-Attached-As-Per-Mmdts:-19027-Rev---3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Push-Fitting-Consisting-Of-04-Items-As-Per-Annexure-Attached-As-Per-Mmdts:-19027-Rev---3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Push Fitting Consisting Of 04 Items
Push Fitting Consisting Of 04 Items As Per Annexure Attached As Per Mmdts: 19027 Rev - 3 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Push-Fitting-Consisting-Of-04-Items-As-Per-Annexure-Attached-As-Per-Mmdts:-19027-Rev---3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-25
India Supply Of Desktop Specification, Monitor, Mfp Printer, 1 Kva Ups, 1 Tb Hdd External. 2024-10-25
India Restore And Interconnection Of Pipe Line With Installation Of Sluice Valve To Regulate Water Supply And Road Restoration For Kota-chandipur Pwss Under Aushgram-ii Of Dwsd,phe Dte 2024-10-25
India Balance Work For Nirshinhapur Piped W/s Schem Construction Of Lds,construction Of Switch Rooms And Boundary Walls With Gates And Land Development Drain And Interanal Pathways Etc At 3rd Pump House Site Under Aushgram-ii ,dist-purba Bardhaman. 2024-10-25
India Construction Of Concrete Road From Kapil Naskar House To Palan Naskar House 2024-10-25
Whats app