Filter Search


Transportation


Location Summary Deadline
India Consultancy Package For Detailed Feasibility Study (fsr/fr) For Augmentation Of Railway Siding Infrastructure And Systems Including Over Head Electrification And Sandt For Gadarwara Stpp Stage-ii (2x800 Mw) 2024-10-24
-Badli-Railway-Station-2nd-Entry-(bhd):-Site-For-Cycle->India -Badli-Railway-Station-2nd-Entry-(bhd):-Site-For-Cycle->Parking - Four Wheeler, Tugalakabad Railway Station(tkd): Site For Car Parking With Measuring An Area Of 607.05 Sqr. Mtrs At Tugalakabad Railway Station Nsg-4 ('d' Category Station), Delhi Area.
Badli Railway Station 2nd Entry (bhd): Site For Cycle-
-Badli-Railway-Station-2nd-Entry-(bhd):-Site-For-Cycle->2024-10-24
-Spacer-For-Suspension-Tube-Of-Gm-Loco-Sizes-12.7/16-Inch-Id-X-14.11/16-Inch-Od-X-0.121-Thick-To-Emd-Part-No.-40044964.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,>India -Spacer-For-Suspension-Tube-Of-Gm-Loco-Sizes-12.7/16-Inch-Id-X-14.11/16-Inch-Od-X-0.121-Thick-To-Emd-Part-No.-40044964.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,>Supply Of Spacer For Suspension Tube
Spacer For Suspension Tube Of Gm Loco Sizes 12.7/16 Inch Id X 14.11/16 Inch Od X 0.121 Thick To Emd Part No. 40044964. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age ,
-Spacer-For-Suspension-Tube-Of-Gm-Loco-Sizes-12.7/16-Inch-Id-X-14.11/16-Inch-Od-X-0.121-Thick-To-Emd-Part-No.-40044964.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,>2024-10-24
India Construction Of Road - Mrl-04-shirgaon Bazarpeth To Nigadewadi Dhanagarwadi Road Block Chiplun2.mrl-07-moravane To Nirbade Highschool Muslimwadi Deolwadi Road Block Chiplun Dist.ratnagiri 2024-10-24
India Construction Of Road - Mrl-28-tondali Bhokriche Bhatle To Kalbatwadi Tondali Sahan Road Block Chiplun 2.t-04-pomendi Gonavliwadi To Adiwadi Road Block Guhagar Dist Ratnagiri 2024-10-24
India Construction Of Road - Mrl-16-songaon To Lote Road Block Khed 2.mrl-12 Musad Kurvalkhed Bangalwadi Road Block Khed Dist Ratnagiri 2024-10-24
India Construction Of Road - Mrl-14-patgaon Ghati To Kirdadi To Ambav Kond Kadamrao Sangave Road Block Sagameshwar 2. Mrl-05-deorukh Talavade Tikaleshwar Tempal Road Block Sangmeshwar Dist. Ratnagiri 2024-10-24
India Construction Of Road Work Through Rcc Drain And Cc From Mustafai Masjid Irshad Bhai To Sabir Bhai House Via Niamat Bhai In Ward No. 58 2024-10-24
India Construction Of Box Drain And Vdcc Road From Defence Drdl Wall To Maqbool Pan Shop Beside Bismillah Hotel M-block And C-block, Of Hafez Baba Nagar In Chandrayangutta (reach-i) 2024-10-24
India Maintenance Of Shoulder By Dressing & Chilchalling From Ch. 115.250 To 118.450 Kmp At Different Locations At Flank Of N.h.60 , Under Salboni N.h. Sub Division Of N.h. Division -ii, P.w. ( Roads ) Directorate , In The District Of Pashchim Medinipur, During 2024-10-24
Whats app