Filter Search


Transportation


Location Summary Deadline
India Construction Of C C Road From Subrata Mali Tea Shop To Gurupada Mondal At Barada Rajarampur Under Chaitanyapur Gram Panchayat 2024-10-22
India Construction Of C C Road From Sayed Abuji Ali House To Sayed Asraf Ali House At Raghunathpur Under Chaitanyapur Gram Panchayat 2024-10-22
-Construction-Of-Road-From-Uttar-Hiragange-To-Aijul-House-Under-Hirapur-G.p.-Within-Uluberia-i-P.-Samity.>India -Construction-Of-Road-From-Uttar-Hiragange-To-Aijul-House-Under-Hirapur-G.p.-Within-Uluberia-i-P.-Samity.>33 Of 2024-25(1st Call) Sl. No.1 Dt-01.10.24
Construction Of Road From Uttar Hiragange To Aijul House Under Hirapur G.p. Within Uluberia-i P. Samity.
-Construction-Of-Road-From-Uttar-Hiragange-To-Aijul-House-Under-Hirapur-G.p.-Within-Uluberia-i-P.-Samity.>2024-10-22
-Construction-Of-Road-From-Bhola-House-To-Answar-Ali-House-Under-Khalisani-G.p.-Within-Uluberia-ii-P.-Samity.>India -Construction-Of-Road-From-Bhola-House-To-Answar-Ali-House-Under-Khalisani-G.p.-Within-Uluberia-ii-P.-Samity.>33 Of 2024-25(1st Call) Sl. No.3 Dt-01.10.24
Construction Of Road From Bhola House To Answar Ali House Under Khalisani G.p. Within Uluberia-ii P. Samity.
-Construction-Of-Road-From-Bhola-House-To-Answar-Ali-House-Under-Khalisani-G.p.-Within-Uluberia-ii-P.-Samity.>2024-10-22
-Construction-Of-Cc-Road-From-Biren-Mahato-House-To-Rama-Singh-House-At-Chhiail-Booth-Under-Gopalbati-Gp-Within-Balurghat-Panchayat-Samity,-Balurghat,-Dakshin-Dinajpur.>India -Construction-Of-Cc-Road-From-Biren-Mahato-House-To-Rama-Singh-House-At-Chhiail-Booth-Under-Gopalbati-Gp-Within-Balurghat-Panchayat-Samity,-Balurghat,-Dakshin-Dinajpur.>Enit-10 (2024-25)
Construction Of Cc Road From Biren Mahato House To Rama Singh House At Chhiail Booth Under Gopalbati Gp Within Balurghat Panchayat Samity, Balurghat, Dakshin Dinajpur.
-Construction-Of-Cc-Road-From-Biren-Mahato-House-To-Rama-Singh-House-At-Chhiail-Booth-Under-Gopalbati-Gp-Within-Balurghat-Panchayat-Samity,-Balurghat,-Dakshin-Dinajpur.>2024-10-22
-Construction-Of-Road-With-Protection-From-Kabarsthan-To-Sk-Sirajuddin-House-At-D.chaklai-14>India -Construction-Of-Road-With-Protection-From-Kabarsthan-To-Sk-Sirajuddin-House-At-D.chaklai-14>335/dhgp/2024-25 Sl No 02
Construction Of Road With Protection From Kabarsthan To Sk Sirajuddin House At D.chaklai 14
-Construction-Of-Road-With-Protection-From-Kabarsthan-To-Sk-Sirajuddin-House-At-D.chaklai-14>2024-10-22
-Construction-Of-Paver-Block-Road-From-Motor-Kalibari-To-Chhatrapur-Rakhal-Kalibari-Temple-Under-13-No-Kamlabari-Gp-Under-Raiganj-Block-In-The-Dist-Of-Uttar-Dinajpur.-(total-Length--1.90-Km,-Width--3.0-Mtr,-Protection-Work--Dr>India -Construction-Of-Paver-Block-Road-From-Motor-Kalibari-To-Chhatrapur-Rakhal-Kalibari-Temple-Under-13-No-Kamlabari-Gp-Under-Raiganj-Block-In-The-Dist-Of-Uttar-Dinajpur.-(total-Length--1.90-Km,-Width--3.0-Mtr,-Protection-Work--Dr>Nie-t- 26/2024-25/sl-19
Construction Of Paver Block Road From Motor Kalibari To Chhatrapur Rakhal Kalibari Temple Under 13 No Kamlabari Gp Under Raiganj Block In The Dist Of Uttar Dinajpur. (total Length- 1.90 Km, Width- 3.0 Mtr, Protection Work- Dr
-Construction-Of-Paver-Block-Road-From-Motor-Kalibari-To-Chhatrapur-Rakhal-Kalibari-Temple-Under-13-No-Kamlabari-Gp-Under-Raiganj-Block-In-The-Dist-Of-Uttar-Dinajpur.-(total-Length--1.90-Km,-Width--3.0-Mtr,-Protection-Work--Dr>2024-10-22
India Construction Of Cc Road From Sk Safik House To Mojammel House At Jhirul. 2024-10-22
India Construction Of Of Peb Shed Office Staff Building And Cement Road. 2024-10-22
-Supply-&-Installation-Of-Emergency-Panel-On-Place-Of-Damage-Emergency-Panel.-
-Supply-&-Installation-Of-330-Kv-Dg-Set-On-Place-Of-230-Kv-Dg-Set.>India
-Supply-&-Installation-Of-Emergency-Panel-On-Place-Of-Damage-Emergency-Panel.-
-Supply-&-Installation-Of-330-Kv-Dg-Set-On-Place-Of-230-Kv-Dg-Set.>Special Repair Work Of Fire Fighting & Fire Hydrant.
Supply & Installation Of Emergency Panel On Place Of Damage Emergency Panel.
Supply & Installation Of 330 Kv Dg Set On Place Of 230 Kv Dg Set.
-Supply-&-Installation-Of-Emergency-Panel-On-Place-Of-Damage-Emergency-Panel.-
-Supply-&-Installation-Of-330-Kv-Dg-Set-On-Place-Of-230-Kv-Dg-Set.>2024-10-22
Whats app