Filter Search


Transportation


Location Summary Deadline
India Engagement Of User Fee Collection Agency On The Basis Of Cb Through Etender For Lehrabega Fp At Existing Km 191.929 On Tapa To Bathinda Section Of Nh64 Under Nhdp-iv On Epc Basis In Punjab 2024-10-22
-Supply-Of-Cam-Follower-With-Hexagonal-Hole-With-Nut-M/s-M/c-Gill-Model-No.cf-2-1/4-Inch-Sb-Or-Equivalent-In-Iko-Or-Ina-Make.-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]>India -Supply-Of-Cam-Follower-With-Hexagonal-Hole-With-Nut-M/s-M/c-Gill-Model-No.cf-2-1/4-Inch-Sb-Or-Equivalent-In-Iko-Or-Ina-Make.-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]>Supply Of Cam Follower With Hexagonal Hole
Supply Of Cam Follower With Hexagonal Hole With Nut M/s M/c Gill Model No.cf-2 1/4 Inch Sb Or Equivalent In Iko Or Ina Make. [ Warranty Period: 12 Months After The Date Of Delivery ] ]
-Supply-Of-Cam-Follower-With-Hexagonal-Hole-With-Nut-M/s-M/c-Gill-Model-No.cf-2-1/4-Inch-Sb-Or-Equivalent-In-Iko-Or-Ina-Make.-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]>2024-10-22
-Repair-Work-In-Sub-Center.-
-Iron-Profile-Sheet,-Plaster,-Painting-&-Repair-Work-In-Primary-Health-Center.-
-Construction-Work-Of-Room-&-Other-Work.-
-Construction-Of-Boundary-Wall,-Railing.-India
-Repair-Work-In-Sub-Center.-
-Iron-Profile-Sheet,-Plaster,-Painting-&-Repair-Work-In-Primary-Health-Center.-
-Construction-Work-Of-Room-&-Other-Work.-
-Construction-Of-Boundary-Wall,-Railing.-Wall, Floor & Complete Repair Work Of Room.
Repair Work In Sub Center.
Iron Profile Sheet, Plaster, Painting & Repair Work In Primary Health Center.
Construction Work Of Room & Other Work.
Construction Of Boundary Wall, Railing.
-Repair-Work-In-Sub-Center.-
-Iron-Profile-Sheet,-Plaster,-Painting-&-Repair-Work-In-Primary-Health-Center.-
-Construction-Work-Of-Room-&-Other-Work.-
-Construction-Of-Boundary-Wall,-Railing.-2024-10-22
India Supply Of Speed Sensor Mil Grade Connector To Kbi Part No N75599 [ Warranty Period: 36 Months After The Date Of Delivery ] ] 2024-10-22
India Construction And Development Of Approach Road In Rupaichari Emrs (length 300 Mtrs) Within Adc Areas During The Year 2024-25. # Construction And Development Of Approach Road In Hezamara Emrs (length 150 Mtrs) With In Adc Areas During The Year 2024-25. 2024-10-22
India Construction I/c M&bt Of A Road From Nachilpara To Darugre. 2024-10-22
-Canal-Structure>India -Canal-Structure>Construction Of Vrb And Its Approches At Rd 916m Of Balarampur Disty. Of Sip.
Canal Structure
-Canal-Structure>2024-10-22
India Supply Of Center Pivot Pin To Drg. No. T-0-6-602 Item 1 Alt C/14 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2024-10-22
India Printing And Supply Of Beml Executive Note Book 2025. 2024-10-22
-Supply-And-Fitment-Of-Set-Of-1)outside-Wash-Basin-Drain-Pipe-Modification-And-Fitment-I>India -Supply-And-Fitment-Of-Set-Of-1)outside-Wash-Basin-Drain-Pipe-Modification-And-Fitment-I>Supply Of Supply And Fitment Of Set Outside Wash Basin Drain Pipe, New Ss Dustbin Assembly, Holding Bracket Of Fire Extinguisher, Holding Bracket Of Ss Dust Bin.
Supply And Fitment Of Set Of 1)outside Wash Basin Drain Pipe Modification And Fitment I
-Supply-And-Fitment-Of-Set-Of-1)outside-Wash-Basin-Drain-Pipe-Modification-And-Fitment-I>2024-10-22
Whats app