Filter Search


Transportation


Location Summary Deadline
-Manufacturing-And-Supply-Of-11200-Mm-Curved-Thick-Web-Switches-1-In-16,-60kg-With-Zu-1-60-/-60e1a1-Thick-Web-Grade-880>India -Manufacturing-And-Supply-Of-11200-Mm-Curved-Thick-Web-Switches-1-In-16,-60kg-With-Zu-1-60-/-60e1a1-Thick-Web-Grade-880>Supply Of Manufacturing And Supply Of 11200 Mm Curved Thick Web Switches 1 In 16, 60kg With Zu- 1-60 / 60e1a1 Thick Web Grade 880
Manufacturing And Supply Of 11200 Mm Curved Thick Web Switches 1 In 16, 60kg With Zu-1-60 / 60e1a1 Thick Web Grade 880
-Manufacturing-And-Supply-Of-11200-Mm-Curved-Thick-Web-Switches-1-In-16,-60kg-With-Zu-1-60-/-60e1a1-Thick-Web-Grade-880>2024-10-22
-Finger-Contact-And-Flexible-Shunt-Assly.-For-Ctf-&-J-[high-Capacity-1500-Amp]-To-Clw-Drg.no.4twd.101.064-Alt-6-[sheet-No.-0].-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Finger-Contact-And-Flexible-Shunt-Assly.-For-Ctf-&-J-[high-Capacity-1500-Amp]-To-Clw-Drg.no.4twd.101.064-Alt-6-[sheet-No.-0].-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Finger Contact And Flexible Shunt Assly
Finger Contact And Flexible Shunt Assly. For Ctf & J [high Capacity 1500 Amp] To Clw Drg.no.4twd.101.064 Alt-6 [sheet No.-0]. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Finger-Contact-And-Flexible-Shunt-Assly.-For-Ctf-&-J-[high-Capacity-1500-Amp]-To-Clw-Drg.no.4twd.101.064-Alt-6-[sheet-No.-0].-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-22
India 450 mm dia pipe crossing by adopting trenchless technologies (e.g. Jack Pushing Method etc) Ch. 222.05 near Damlia OCP for IOCL crossing of rising main (Part-A) under RCFA Part-II Vol-I PWSS under RCFA Division-I PHE Dte. 2024-10-22
India Restoration of Concrete road at Zone-11(Part-6) under RCFA Div-I PHE Dte. 2024-10-22
India Interconnection at Runakuraghat pump house for Panuria including Cable trench,drain and adopting trenchless technologies(e.g jack Pushing Method etc.) at Runakuraghat Gourandi road for risingmain connection and allied works under RCFA Div-I PHE Dte 2024-10-22
India Balance work of dismantling of concrete, restoration of road including pipe crossing by adopting trenchless technologies (e.g Jack Pushing Method etc.) 03 nos. location at Bahula(Zone-9) within Pandabeswar Block under RCFA Division-I PHE Dte. 2024-10-22
India Balance work of dismantling of concrete,restoration of road including pipe crossing by adopting trenchless technologies (e.g. Jack Pushing Method etc.) 03 nos. location at Haripur (Zone-14B) within Pandabeswar Block under RCFA Division-I PHE Dte. 2024-10-22
India Additional work related to road restoration at different location of Main Bazar, Circus Ground,Dangal Para,Bibir Bandh Para,Huchuk Para,Kankar Danga,Chanchani and road crossing(by Jack Pushing method) at Ukhra Bajpayee More under Ukhra GP of RCFA Par 2024-10-22
India Balance work for road restoration and allied work at different location within Pandabeswar block under RCFA Part-II under RCFA Division-I PHE Dte. 2024-10-22
India Additional work for Concrete road restoration for distribution network of Zone-9 for RCFA Part-II PWS scheme, Block-Raniganj, Dist-Paschim Bardhaman, under RCFA Div-I PHE Dte. 2024-10-22
Whats app