Filter Search


Transportation


Location Summary Deadline
qty:52
>India
qty:52
>Supply Of Portable Fire Extinguishers (v3) As Per Bs En Standards (q2)
qty:52
qty:52
>2024-10-19
India Providing Of Event Or Seminar Or Workshop Or Exhibition Or Expo Management Service - National; Theme Based Events; Conceptualization Planning, Coordination Staffing, Participation Arrangements, Venue Development, Artists; Buyer Premise; Half Day 2024-10-19
qty:8
>India
qty:8
>Supply Of High Pressure Fire Fighting Hose - Is 14933 (q2)
qty:8
qty:8
>2024-10-19
qty:15
>India
qty:15
>Supply Of A Low Water Alarm, B Low Water Alarm, C Low Water Alarm, D Low Water Alarm, E Low Water Alarm
qty:15
qty:15
>2024-10-19
India General-provide Drainage Facilities On Nattukkal Palode- Chethallur- Muriyamkkanni-panamkkunnu -irakkingal -karipamana -thubakkanni -kadampazhipuram Road Km 20/200--general Civil Work 2024-10-19
India Providing Of Manpower Outsourcing Services - Minimum Wage - Unskilled; Not Required; Others 2024-10-19
qty:600
>India
qty:600
>Supply Of Pvc Channel (q3)
qty:600
qty:600
>2024-10-19
India Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Not Required; Others 2024-10-19
-Second-Metalling-And-Tarring-For-177-M-At-Chainage-0/00m-As-The-Portion-Is-Fully-Damaged-Due-To-Heavy-Flow-Of-Rain-Water-And-Hence-V>India -Second-Metalling-And-Tarring-For-177-M-At-Chainage-0/00m-As-The-Portion-Is-Fully-Damaged-Due-To-Heavy-Flow-Of-Rain-Water-And-Hence-V>Annual Plan-ward 13 Aachickal Perumbanakkuzhi Road Retarring In Veliyannoor G P Under Annual Plan 2024-25 Vlnr 24/25
Second Metalling And Tarring For 177 M At Chainage 0/00m As The Portion Is Fully Damaged Due To Heavy Flow Of Rain Water And Hence V
-Second-Metalling-And-Tarring-For-177-M-At-Chainage-0/00m-As-The-Portion-Is-Fully-Damaged-Due-To-Heavy-Flow-Of-Rain-Water-And-Hence-V>2024-10-19
-In-Two-Stretches-Of-15m-And-8m-Is-Damaged-Completly-Provision-Included-Scarifying-The-Damaged-Portion-And-Concreting-The-Portion-For-15>India -In-Two-Stretches-Of-15m-And-8m-Is-Damaged-Completly-Provision-Included-Scarifying-The-Damaged-Portion-And-Concreting-The-Portion-For-15>Annual Plan-ward 13 Chirayam Arivavalavu Road Maintenance In Veliyannoor G P Under Annual Plan 2024-25-vlnr 25/25
In Two Stretches Of 15m And 8m Is Damaged Completly Provision Included Scarifying The Damaged Portion And Concreting The Portion For 15
-In-Two-Stretches-Of-15m-And-8m-Is-Damaged-Completly-Provision-Included-Scarifying-The-Damaged-Portion-And-Concreting-The-Portion-For-15>2024-10-19
Whats app