Filter Search


Transportation


Location Summary Deadline
India General-provide Drainage Facilities On Nattukkal Palode- Chethallur- Muriyamkkanni-panamkkunnu -irakkingal -karipamana -thubakkanni -kadampazhipuram Road Km 20/200--general Civil Work 2024-10-19
India Providing Of Manpower Outsourcing Services - Minimum Wage - Unskilled; Not Required; Others 2024-10-19
qty:600
>India
qty:600
>Supply Of Pvc Channel (q3)
qty:600
qty:600
>2024-10-19
India Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Not Required; Others 2024-10-19
-Second-Metalling-And-Tarring-For-177-M-At-Chainage-0/00m-As-The-Portion-Is-Fully-Damaged-Due-To-Heavy-Flow-Of-Rain-Water-And-Hence-V>India -Second-Metalling-And-Tarring-For-177-M-At-Chainage-0/00m-As-The-Portion-Is-Fully-Damaged-Due-To-Heavy-Flow-Of-Rain-Water-And-Hence-V>Annual Plan-ward 13 Aachickal Perumbanakkuzhi Road Retarring In Veliyannoor G P Under Annual Plan 2024-25 Vlnr 24/25
Second Metalling And Tarring For 177 M At Chainage 0/00m As The Portion Is Fully Damaged Due To Heavy Flow Of Rain Water And Hence V
-Second-Metalling-And-Tarring-For-177-M-At-Chainage-0/00m-As-The-Portion-Is-Fully-Damaged-Due-To-Heavy-Flow-Of-Rain-Water-And-Hence-V>2024-10-19
-In-Two-Stretches-Of-15m-And-8m-Is-Damaged-Completly-Provision-Included-Scarifying-The-Damaged-Portion-And-Concreting-The-Portion-For-15>India -In-Two-Stretches-Of-15m-And-8m-Is-Damaged-Completly-Provision-Included-Scarifying-The-Damaged-Portion-And-Concreting-The-Portion-For-15>Annual Plan-ward 13 Chirayam Arivavalavu Road Maintenance In Veliyannoor G P Under Annual Plan 2024-25-vlnr 25/25
In Two Stretches Of 15m And 8m Is Damaged Completly Provision Included Scarifying The Damaged Portion And Concreting The Portion For 15
-In-Two-Stretches-Of-15m-And-8m-Is-Damaged-Completly-Provision-Included-Scarifying-The-Damaged-Portion-And-Concreting-The-Portion-For-15>2024-10-19
-Extend-One-End-Of-The-Slab-Culvert-By-Providing-A-Beam-Connecting-The-Side-Protection-Wall-And-Proving-Hand-Rails-And-Som>India -Extend-One-End-Of-The-Slab-Culvert-By-Providing-A-Beam-Connecting-The-Side-Protection-Wall-And-Proving-Hand-Rails-And-Som>Annual Plan-ward 13 Kottamkombu Chakkalappara Road Side Protection Work In Veliyannoor G P Under Annual Plan 2024-25 Vlnr 26/25
Extend One End Of The Slab Culvert By Providing A Beam Connecting The Side Protection Wall And Proving Hand Rails And Som
-Extend-One-End-Of-The-Slab-Culvert-By-Providing-A-Beam-Connecting-The-Side-Protection-Wall-And-Proving-Hand-Rails-And-Som>2024-10-19
-False-Ceiling-In-First-Floor-Platform-Aluminium-Shutters-For-Doors-And-Windows-Demolishing-Existing-Walls-Ceramic-Flooring-Compound-Wall-In-Ground>India -False-Ceiling-In-First-Floor-Platform-Aluminium-Shutters-For-Doors-And-Windows-Demolishing-Existing-Walls-Ceramic-Flooring-Compound-Wall-In-Ground>Annual Plan-thamarakkadu Anganwadi Maintenance In Veliyannoor G P Under Annual Plan 2024-25-vlnr 59/25
False Ceiling In First Floor Platform Aluminium Shutters For Doors And Windows Demolishing Existing Walls Ceramic Flooring Compound Wall In Ground
-False-Ceiling-In-First-Floor-Platform-Aluminium-Shutters-For-Doors-And-Windows-Demolishing-Existing-Walls-Ceramic-Flooring-Compound-Wall-In-Ground>2024-10-19
Iran Islamic Republic of Local Material Transportation Works 2024-10-19
-Re-tarring-For-A-Total-Length-Of-461m-And-Width-3m>India -Re-tarring-For-A-Total-Length-Of-461m-And-Width-3m>Annual Plan-ward 12 Vadakedathu Peedika Kudukkapara Road Maintenance In Veliyannoor G P Under Annual Plan 2024-25 Vlnr 66/25
Re-tarring For A Total Length Of 461m And Width 3m
-Re-tarring-For-A-Total-Length-Of-461m-And-Width-3m>2024-10-19
Whats app