Filter Search


Transportation


Location Summary Deadline
India Construction Of Concrete Road From Main Road To House Of Fakir Chand Sepai Via Sajamal Mallick 2024-10-21
India Cement Concrete Work On Roads At Aadiwasi Kankad Behind Omex City 1 In Ward No. 36 Under Zone No. 22 2024-10-21
India Cement Concrete Work On Road From Shiv Mandir To Village At Lasudiya Mori In Ward No. 35 Under Zone No. 08 2024-10-21
India Cement Concrete Work On Damaged Road In Front Of House No. 42-a And 52-a And Nearby Lanes At Prime City Colony In Ward No. 27 Under Zone No. 05 2024-10-21
India Construction Of Concrete Road From Samanta Para Main Road To House Of Shyamali Chatterjee 2024-10-21
India Cement Concrete Work From Malviya Tailors Lane To House No. 264 E.s. 3 To House No. 285 House No. 193 To House No. 179 And House No. 117 Sharma Medical Lanes Road In Ward No. 34 Under Zone No. 07 2024-10-21
-Development-Of-Passage-From-29/a-Srigopal-Mullick-Lane-To-14-Harish-Sikdar-Path-In-Ward-No-40-Under-Br-v>India -Development-Of-Passage-From-29/a-Srigopal-Mullick-Lane-To-14-Harish-Sikdar-Path-In-Ward-No-40-Under-Br-v>Kmc/ee(c)/br-v/040/17/24-25
Development Of Passage From 29/a Srigopal Mullick Lane To 14 Harish Sikdar Path In Ward No-40 Under Br-v
-Development-Of-Passage-From-29/a-Srigopal-Mullick-Lane-To-14-Harish-Sikdar-Path-In-Ward-No-40-Under-Br-v>2024-10-21
-Restoration-Of-Footpath-At-Raja-Rammohan-Sarani,-M.g.-Road-In-Ward-37-Under,-Borough-v>India -Restoration-Of-Footpath-At-Raja-Rammohan-Sarani,-M.g.-Road-In-Ward-37-Under,-Borough-v>Kmc/ee(c)/br-v/037/23/24-25
Restoration Of Footpath At Raja Rammohan Sarani, M.g. Road In Ward-37 Under, Borough-v
-Restoration-Of-Footpath-At-Raja-Rammohan-Sarani,-M.g.-Road-In-Ward-37-Under,-Borough-v>2024-10-21
-Construction-Of-Cc-Road-From-Kamdebnagar-Black-Top-Road-To-Banshidari-Panda-House-Kamdebnagar-Sansad-Kala/x-Jl141-Plot-2498-2511>India -Construction-Of-Cc-Road-From-Kamdebnagar-Black-Top-Road-To-Banshidari-Panda-House-Kamdebnagar-Sansad-Kala/x-Jl141-Plot-2498-2511>E-nit/07/5th Sfc/kgp/(2023-24)2024-25
Construction Of Cc Road From Kamdebnagar Black Top Road To Banshidari Panda House Kamdebnagar Sansad Kala/x Jl141 Plot 2498-2511
-Construction-Of-Cc-Road-From-Kamdebnagar-Black-Top-Road-To-Banshidari-Panda-House-Kamdebnagar-Sansad-Kala/x-Jl141-Plot-2498-2511>2024-10-21
-Fitting,-Fixing-Fire-Hydrant-Lending-(fhl)-Valve-On-The-Existing-Pipe-Line,-Fixing-Bamboo-Post-For-Demarcation-For-Fire-Fighting-And-Allied-Works-(for-Zone-i-Area)-In-Connection-With-G.s.-Mela-2025-Under-Kakdwip-Sub-divn.-Of-Alip>India -Fitting,-Fixing-Fire-Hydrant-Lending-(fhl)-Valve-On-The-Existing-Pipe-Line,-Fixing-Bamboo-Post-For-Demarcation-For-Fire-Fighting-And-Allied-Works-(for-Zone-i-Area)-In-Connection-With-G.s.-Mela-2025-Under-Kakdwip-Sub-divn.-Of-Alip>Niet-43/ad/24-25/12
Fitting, Fixing Fire Hydrant Lending (fhl) Valve On The Existing Pipe Line, Fixing Bamboo Post For Demarcation For Fire Fighting And Allied Works (for Zone-i Area) In Connection With G.s. Mela 2025 Under Kakdwip Sub-divn. Of Alip
-Fitting,-Fixing-Fire-Hydrant-Lending-(fhl)-Valve-On-The-Existing-Pipe-Line,-Fixing-Bamboo-Post-For-Demarcation-For-Fire-Fighting-And-Allied-Works-(for-Zone-i-Area)-In-Connection-With-G.s.-Mela-2025-Under-Kakdwip-Sub-divn.-Of-Alip>2024-10-21
Whats app