Filter Search


Transportation


Location Summary Deadline
India Cement Concrete Work From Malviya Tailors Lane To House No. 264 E.s. 3 To House No. 285 House No. 193 To House No. 179 And House No. 117 Sharma Medical Lanes Road In Ward No. 34 Under Zone No. 07 2024-10-21
-Development-Of-Passage-From-29/a-Srigopal-Mullick-Lane-To-14-Harish-Sikdar-Path-In-Ward-No-40-Under-Br-v>India -Development-Of-Passage-From-29/a-Srigopal-Mullick-Lane-To-14-Harish-Sikdar-Path-In-Ward-No-40-Under-Br-v>Kmc/ee(c)/br-v/040/17/24-25
Development Of Passage From 29/a Srigopal Mullick Lane To 14 Harish Sikdar Path In Ward No-40 Under Br-v
-Development-Of-Passage-From-29/a-Srigopal-Mullick-Lane-To-14-Harish-Sikdar-Path-In-Ward-No-40-Under-Br-v>2024-10-21
-Restoration-Of-Footpath-At-Raja-Rammohan-Sarani,-M.g.-Road-In-Ward-37-Under,-Borough-v>India -Restoration-Of-Footpath-At-Raja-Rammohan-Sarani,-M.g.-Road-In-Ward-37-Under,-Borough-v>Kmc/ee(c)/br-v/037/23/24-25
Restoration Of Footpath At Raja Rammohan Sarani, M.g. Road In Ward-37 Under, Borough-v
-Restoration-Of-Footpath-At-Raja-Rammohan-Sarani,-M.g.-Road-In-Ward-37-Under,-Borough-v>2024-10-21
-Construction-Of-Cc-Road-From-Kamdebnagar-Black-Top-Road-To-Banshidari-Panda-House-Kamdebnagar-Sansad-Kala/x-Jl141-Plot-2498-2511>India -Construction-Of-Cc-Road-From-Kamdebnagar-Black-Top-Road-To-Banshidari-Panda-House-Kamdebnagar-Sansad-Kala/x-Jl141-Plot-2498-2511>E-nit/07/5th Sfc/kgp/(2023-24)2024-25
Construction Of Cc Road From Kamdebnagar Black Top Road To Banshidari Panda House Kamdebnagar Sansad Kala/x Jl141 Plot 2498-2511
-Construction-Of-Cc-Road-From-Kamdebnagar-Black-Top-Road-To-Banshidari-Panda-House-Kamdebnagar-Sansad-Kala/x-Jl141-Plot-2498-2511>2024-10-21
-Fitting,-Fixing-Fire-Hydrant-Lending-(fhl)-Valve-On-The-Existing-Pipe-Line,-Fixing-Bamboo-Post-For-Demarcation-For-Fire-Fighting-And-Allied-Works-(for-Zone-i-Area)-In-Connection-With-G.s.-Mela-2025-Under-Kakdwip-Sub-divn.-Of-Alip>India -Fitting,-Fixing-Fire-Hydrant-Lending-(fhl)-Valve-On-The-Existing-Pipe-Line,-Fixing-Bamboo-Post-For-Demarcation-For-Fire-Fighting-And-Allied-Works-(for-Zone-i-Area)-In-Connection-With-G.s.-Mela-2025-Under-Kakdwip-Sub-divn.-Of-Alip>Niet-43/ad/24-25/12
Fitting, Fixing Fire Hydrant Lending (fhl) Valve On The Existing Pipe Line, Fixing Bamboo Post For Demarcation For Fire Fighting And Allied Works (for Zone-i Area) In Connection With G.s. Mela 2025 Under Kakdwip Sub-divn. Of Alip
-Fitting,-Fixing-Fire-Hydrant-Lending-(fhl)-Valve-On-The-Existing-Pipe-Line,-Fixing-Bamboo-Post-For-Demarcation-For-Fire-Fighting-And-Allied-Works-(for-Zone-i-Area)-In-Connection-With-G.s.-Mela-2025-Under-Kakdwip-Sub-divn.-Of-Alip>2024-10-21
-Guarding-Arrangement-Of-Floating-Barge,-Hose-Pipe-And-Other-Machineries-At-Burning-Ghat-Pumping-Station-Under-Rcfa-i-Water-Supply-Scheme.>India -Guarding-Arrangement-Of-Floating-Barge,-Hose-Pipe-And-Other-Machineries-At-Burning-Ghat-Pumping-Station-Under-Rcfa-i-Water-Supply-Scheme.>Wbphed/ee/amd/niet-28 Of 2024-2025/1
Guarding Arrangement Of Floating Barge, Hose Pipe And Other Machineries At Burning Ghat Pumping Station Under Rcfa-i Water Supply Scheme.
-Guarding-Arrangement-Of-Floating-Barge,-Hose-Pipe-And-Other-Machineries-At-Burning-Ghat-Pumping-Station-Under-Rcfa-i-Water-Supply-Scheme.>2024-10-21
-Engagement-Of-Working-Personnel-For-Guarding-Of-02(two)-Nos.-5-And-2.25-Cusec-Heavy-Duty-Seasonal-Pump-Set-At-Fatesha-Khal-Site-,dist.north-24-Parganas-(for-Non-monsoon-Period)-To-Be-Executed-By-Metr>India -Engagement-Of-Working-Personnel-For-Guarding-Of-02(two)-Nos.-5-And-2.25-Cusec-Heavy-Duty-Seasonal-Pump-Set-At-Fatesha-Khal-Site-,dist.north-24-Parganas-(for-Non-monsoon-Period)-To-Be-Executed-By-Metr>E-n.i.t. No - Wbiw/ee/mmed/e-nit-10/2024-25 Sl-03
Engagement Of Working Personnel For Guarding Of 02(two) Nos. 5 And 2.25 Cusec Heavy Duty Seasonal Pump Set At Fatesha Khal Site ,dist.north 24 Parganas (for Non-monsoon Period) To Be Executed By Metr
-Engagement-Of-Working-Personnel-For-Guarding-Of-02(two)-Nos.-5-And-2.25-Cusec-Heavy-Duty-Seasonal-Pump-Set-At-Fatesha-Khal-Site-,dist.north-24-Parganas-(for-Non-monsoon-Period)-To-Be-Executed-By-Metr>2024-10-21
India Construction Of Mettling Road Ojanahalli Main Road To Dr Ro Filter In Bhagyanagar Tp Limit. 2024-10-21
India Special And Repair To Certain Roads At Various Locations Under Ge 864 Ews 2024-10-21
-Shifting-Of-Electrical-U>India -Shifting-Of-Electrical-U>Shifting Of Electrical Utilities Infringing Proposed Corridor-1 Of Bengaluru Suburban Rail Project Between Krantiveera Sangolli Rayanna - Yelahanka On Alignment Of Krantiveera Sangolli Rayanna - Devanahalli Section Package-1
Shifting Of Electrical U
-Shifting-Of-Electrical-U>2024-10-21
Whats app