Filter Search


Transportation


Location Summary Deadline
India Provioding Intensive Patch Work To A. P.s Road To N.n. Road Via M.s.v Puram , Elakatur, Mallambakam, Patha Aroor From Km 0/0-4 2/4-6, 3/0-2, 4/2-4, 5/6-8, 6/4-6 And 8/2-3 B. A.r Road To Patha Aruru Via Mangadu, Irugavai From Km 0/0-4, 0/6-10, 2/4-6, 3/8-1 2024-10-15
India Annual Maintenance Of Integrated Security Surveillance System - Health Monitoring Solution For Cctv System; Non-comprehensive; Hardware; Cost Of Consumables To Be Provided To Service Provider Based On Actuals; Defence Establishments; Control Room; Dependi 2024-10-15
-Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-68.>India -Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-68.>Road Work
Resurfacing Of Various Roads In Taluka Dist:under Package No. 68.
-Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-68.>2024-10-15
-Leader-Nut-With-Circlip-And-Dog-Pin-For-Sab-To-Drg-No.-Wd-82064-s/02-Rc,-Alt-7-,-Item-1-(leader-Nut),-Wd-82064-s/08-Rc,-Alt-9,-Item-3-(circlip)-&-Wd-82064-s/05-Rc,-Alt.7,-Item-3-(dog-Pin),-Specn.-07-abr>India -Leader-Nut-With-Circlip-And-Dog-Pin-For-Sab-To-Drg-No.-Wd-82064-s/02-Rc,-Alt-7-,-Item-1-(leader-Nut),-Wd-82064-s/08-Rc,-Alt-9,-Item-3-(circlip)-&-Wd-82064-s/05-Rc,-Alt.7,-Item-3-(dog-Pin),-Specn.-07-abr>Supply Of Leader Nut With Circlip And Dog Pin.
Leader Nut With Circlip And Dog Pin For Sab To Drg No. Wd-82064-s/02 Rc, Alt-7 , Item 1 (leader Nut), Wd-82064-s/08 Rc, Alt-9, Item 3 (circlip) & Wd-82064-s/05 Rc, Alt.7, Item 3 (dog Pin), Specn. 07-abr
-Leader-Nut-With-Circlip-And-Dog-Pin-For-Sab-To-Drg-No.-Wd-82064-s/02-Rc,-Alt-7-,-Item-1-(leader-Nut),-Wd-82064-s/08-Rc,-Alt-9,-Item-3-(circlip)-&-Wd-82064-s/05-Rc,-Alt.7,-Item-3-(dog-Pin),-Specn.-07-abr>2024-10-15
-Qty-:-1
>India
-Qty-:-1
>Support For Oil Level Monitoring Lubrication Cleaning Activities In Hot Mill Cold Mill
Qty : 1
-Qty-:-1
>2024-10-15
India Resurfacing Of Various Roads In Taluka Dist:under Package No. 70. 2024-10-15
-Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-74>India -Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-74>Road
Resurfacing Of Various Roads In Taluka Dist:under Package No. 74
-Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-74>2024-10-15
-Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-76>India -Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-76>Road
Resurfacing Of Various Roads In Taluka Dist:under Package No. 76
-Resurfacing-Of-Various-Roads-In-Taluka-Dist:under-Package-No.-76>2024-10-15
>India >Annual Maintenance Of Integrated Security Surveillance System - As Per Rfp; Comprehensive; Hardware; Cost Of Consumables To Be Provided To Service Provider Based On Actuals; Educational; Control Room; Quarterly; As Per Rfp; As Per Rfp; Not Required
>2024-10-15
India Resurfacing Of Various Roads In Taluka Dist:under Package No.87 2024-10-15
Whats app