Filter Search


Transportation


Location Summary Deadline
India Strengthening And Resurfacing Of Bt Road From Nandira Level Crossing To North Quarry Time Office Of Bocp, Ba (re Tender). 2024-10-16
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-96-Seated-Girls-Hostel-At-Nehu,-Tura-Campus-Including-Civil>India -Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-96-Seated-Girls-Hostel-At-Nehu,-Tura-Campus-Including-Civil>Engineering, Procurement And Construction Of 96 Seated Girls Hostel At Nehu, Tura Campus.
Design, Engineering, Procurement And Construction (epc) For The Infrastructure Development Works Of 96 Seated Girls Hostel At Nehu, Tura Campus Including Civil
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-96-Seated-Girls-Hostel-At-Nehu,-Tura-Campus-Including-Civil>2024-10-16
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Research-Scholar-Boys-Hostel-At-Nehu,-Tura-Campus-Including>India -Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Research-Scholar-Boys-Hostel-At-Nehu,-Tura-Campus-Including>Engineering, Procurement And Construction Of Research Scholar Boys Hostel At Nehu, Campus
Design, Engineering, Procurement And Construction (epc) For The Infrastructure Development Works Of Research Scholar Boys Hostel At Nehu, Tura Campus Including
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Research-Scholar-Boys-Hostel-At-Nehu,-Tura-Campus-Including>2024-10-16
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Research-Scholar-Girls-Hostel-At-Nehu,-Tura-Campus-Includ>India -Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Research-Scholar-Girls-Hostel-At-Nehu,-Tura-Campus-Includ>Engineering, Procurement And Construction Of Research Scholar Girls Hostel At Nehu, Campus.
Design, Engineering, Procurement And Construction (epc) For The Infrastructure Development Works Of Research Scholar Girls Hostel At Nehu, Tura Campus Includ
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Research-Scholar-Girls-Hostel-At-Nehu,-Tura-Campus-Includ>2024-10-16
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Auditorium-(1000-Capacity)-At-Nehu,-Tura-Campus-Including-Civ>India -Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Auditorium-(1000-Capacity)-At-Nehu,-Tura-Campus-Including-Civ>Engineering, Procurement And Construction Of Auditorium (1000 Capacity) At Nehu, Campus
Design, Engineering, Procurement And Construction (epc) For The Infrastructure Development Works Of Auditorium (1000 Capacity) At Nehu, Tura Campus Including Civ
-Design,-Engineering,-Procurement-And-Construction-(epc)-For-The-Infrastructure-Development-Works-Of-Auditorium-(1000-Capacity)-At-Nehu,-Tura-Campus-Including-Civ>2024-10-16
-Buffer-Recoil-Spring-To-Icf-Drg.no.--Icf/std-2-2-015,-Alt--A/nil,-Item-No.-06.-Material-&-Specification-As-Per-Icf/md/spec-353.-(note:--One-Set-Consisting-Of-03-No's-As-Per-Drawing-Item-No.-06).-[-Warranty-Period:-30>India -Buffer-Recoil-Spring-To-Icf-Drg.no.--Icf/std-2-2-015,-Alt--A/nil,-Item-No.-06.-Material-&-Specification-As-Per-Icf/md/spec-353.-(note:--One-Set-Consisting-Of-03-No's-As-Per-Drawing-Item-No.-06).-[-Warranty-Period:-30>Supply Of Buffer Recoil Spring.
Buffer Recoil Spring To Icf Drg.no.- Icf/std-2-2-015, Alt- A/nil, Item No.-06. Material & Specification As Per Icf/md/spec-353. (note:- One Set Consisting Of 03 No's As Per Drawing Item No.-06). [ Warranty Period: 30
-Buffer-Recoil-Spring-To-Icf-Drg.no.--Icf/std-2-2-015,-Alt--A/nil,-Item-No.-06.-Material-&-Specification-As-Per-Icf/md/spec-353.-(note:--One-Set-Consisting-Of-03-No's-As-Per-Drawing-Item-No.-06).-[-Warranty-Period:-30>2024-10-16
-Water-Tank-Assembly-(l.h.)-(390-Liters)-Two-Piece-Design-For-Gs-Lhb-Coach-As-Perrcf-Drg.no.--Lg-63106-Alt.-(g)-Specification-:--Icf/md/spec-182.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Water-Tank-Assembly-(l.h.)-(390-Liters)-Two-Piece-Design-For-Gs-Lhb-Coach-As-Perrcf-Drg.no.--Lg-63106-Alt.-(g)-Specification-:--Icf/md/spec-182.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Water Tank Assembly.
Water Tank Assembly (l.h.) (390 Liters) Two Piece Design For Gs Lhb Coach As Perrcf Drg.no.- Lg 63106 Alt.-(g) Specification :- Icf/md/spec-182. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Water-Tank-Assembly-(l.h.)-(390-Liters)-Two-Piece-Design-For-Gs-Lhb-Coach-As-Perrcf-Drg.no.--Lg-63106-Alt.-(g)-Specification-:--Icf/md/spec-182.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-16
-High-Reach-Pantograph-For-Ac-Electric-Locomotives.-Specification/>India -High-Reach-Pantograph-For-Ac-Electric-Locomotives.-Specification/>Supply Of High Reach Pantograph For Ac Electric Locomotives. Specification/ Drg No.:- Amendment 1 To Rdso/2007/el/spec/0054 Rev-3 Or Latest, Str: Rdso/2008/el/str/0049 Rev 2 Or Latest
High Reach Pantograph For Ac Electric Locomotives. Specification/
-High-Reach-Pantograph-For-Ac-Electric-Locomotives.-Specification/>2024-10-16
India Installed Retro Reflective Sign Board (welcome Gate) Reconstruction/repairing Work Over Various Roads. #* Repair And Painting Of Overhead Structure And New Sign Board On Nh28 High Way On Various Road Side. #* Supply And Fixing Of Retro Reflective Honorabl 2024-10-16
-Bt-Road-Construction-Work.>India -Bt-Road-Construction-Work.>Extension Work Of Electric Pole Light Establishment Work.
Bt Road Construction Work.
-Bt-Road-Construction-Work.>2024-10-16
Whats app