Filter Search


Transportation


Location Summary Deadline
India Construction Of Cc Road From Main Road To Sannyashi Bagdi House At Dauradanga. 2024-07-08
India Construction Of Cc Road From Sapukurpar To Naju Kaji House At Dangsara. 2024-07-08
-As-Per-Technical>India -As-Per-Technical>Rate Contract For Complete Work Of Catching The Stray Animal, Transporting It From There To Latap And Releasing It In The Border Forest Of Tadgar
As Per Technical
-As-Per-Technical>2024-07-08
India Supply Of Led Signal (route Aspect), 110v Ac Retrofittable In Existing Cls Housing And Compatible With Ac Led Ecr As Per Rdso Specn.no.rdso/spn/153/2011 (rev.4.1) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] 2024-07-08
-Qty-:-12
>India
-Qty-:-12
>Annual Maintenance Contract / Comprehssive Maintenance Contract Of Fire Detection, Fire Alarm, Fire Hydrant Sprinkler System
Qty : 12
-Qty-:-12
>2024-07-08
-Qty-:-2
>India
-Qty-:-2
>Supply Of Operating System Software (v2) (q2)
Qty : 2
-Qty-:-2
>2024-07-08
India Supply Of Axle End Cover (speed Sensor) For Lhb Coaches To Drg No.1902714, Ver-07r1, Mat. Spec. %u2013 17.334 100 06, Sg 400/15 Is:1865, Mdts-166 (rev-02) [ Warranty Period: 30 Months After The Date Of Delivery ] 2024-07-08
India Footpath Construction Work From Vivek Vihar Sector A College Road To Gokuldham Main Road. 2024-07-08
India Supply Of Plain Copier Paper (v2) As Per Is 14490 (q4), Diaries Printed - Plain - Register (q4), File Folder Cover (v2) (q4), Roller Ball Pen (v2) (q4), Black Lead Pencils (v2) As Per Is 1375 (q4), Fluid Correction Pen (v2) (q4), Self Adhesive Flags (v2) 2024-07-08
India Supply Of Crimping Socket 70 Sq. Mm With Stud Size, M16 To Item No. 18 Of Rcf Specification No. Edts 200, Rev. Nil, Am - 2, Cor. 1, 2 & 3. [ Warranty Period: 12 Months After The Date Of Delivery ] 2024-07-08
Whats app