Filter Search


Transportation


Location Summary Deadline
India Front Cover .#* Front Cover, As Per Drawing: Emu/m-0-2-013 Alt.m Item 2, Packing Instruction: Wo oden Box, Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-14
India Construction Of Interlocking Road And Drain From Prj Lko Nh To Well Of Bachcha Maurya At Ward-08. 2025-07-14
India Swing Door Frame With Panel (l.h.) To Rdso Drawing No. Wd-90030-s-66 .#* Swing Door Frame With Panel (l.h.) To Rdso Drawing No. Wd-90030-s-66 Alt.10 Item N o.1 Along With Items No. 1a, 4, 5, 6, 7, 8, 8a, 9, 11 &13 In Assembled Condition In Assembled Condi 2025-07-14
India Maintenance Operation Electrical Installation & Fans, Maintenance And Operation Of 160 Kva Dg Set, Passenger Lifts, Sub-station, Fire Alarm System, Wet Riser System, Ups System, Epabx System And A.c. Units For G.s.i At Marripalem, Visakhapatnam During 202 2025-07-14
India Replacement Of Old Wornout Fire Fighting Equipments At Incomne Tax Office, Dabagardens, Visakhapatnam. .#* One 2025-07-14
India Extruded Receptacel. .#* Extruded Receptacel For Wind Screen Assly Drg No Clw 1209-03 -130-263 Alt 3, It em 4 & 5 Spec No Epdm (01 Set = 02 Nos) Each Length Of 13.5 Mtrs. Type Of Loco- Wag-5, Wag-7. [ warranty Period: 30 Months After The Date Of Delivery 2025-07-14
India Casnub Bogie Gauges .#* Casnub Bogie Gauges As Per Annexure-b . [ Warranty Period: 30 Months After The Dat e Of Delivery ] ] 2025-07-14
India Construction Of Interlocking Road And Drain From Kudratulla House To Shamim House Via Masjid, Ward 10 Mohalla Ravn. 2025-07-14
India Construction Of Bus Stand At Darbhanga 2025-07-14
India Construction Of Interlocking Road And Drain From Nindura Damar Road To Heeralal House At Ward 13 Mohlla Nindura. 2025-07-14
Whats app