Filter Search


Transportation


Location Summary Deadline
-Widng-From-2lane-To-4lane-Km6.5-To-9.2-And-2lane-With-Pavedshoulder-4lane-From-Km-9.2to0.8-Streng-At-Km1.4-To-2.4-And-4.4-To-6.5-Of-North-Coimbatore-Maruthamalai-Rd-Widing-Of-Culverts-Minor-Brig-Stromwater-Drain-Footpath-Paverblock-Cen>India -Widng-From-2lane-To-4lane-Km6.5-To-9.2-And-2lane-With-Pavedshoulder-4lane-From-Km-9.2to0.8-Streng-At-Km1.4-To-2.4-And-4.4-To-6.5-Of-North-Coimbatore-Maruthamalai-Rd-Widing-Of-Culverts-Minor-Brig-Stromwater-Drain-Footpath-Paverblock-Cen>Cridp 2026-27
Widng From 2lane To 4lane Km6.5 To 9.2 And 2lane With Pavedshoulder 4lane From Km 9.2to0.8 Streng At Km1.4 To 2.4 And 4.4 To 6.5 Of North Coimbatore Maruthamalai Rd Widing Of Culverts Minor Brig Stromwater Drain Footpath Paverblock Cen
-Widng-From-2lane-To-4lane-Km6.5-To-9.2-And-2lane-With-Pavedshoulder-4lane-From-Km-9.2to0.8-Streng-At-Km1.4-To-2.4-And-4.4-To-6.5-Of-North-Coimbatore-Maruthamalai-Rd-Widing-Of-Culverts-Minor-Brig-Stromwater-Drain-Footpath-Paverblock-Cen>2026-02-07
-Wdg-From-2l-With-Paved-Shoulder-To-4l-And-Steg-At-Km-33-0-To-40-0-Of-Avinashi-Tiruppur-Palladam-Pollachi-Cochin-Road-Via-Meenkarai-Including-Cd-Works-Reconstn-Of-Box-Culverts-Junction-Impts-And-Constn-Of-Reg-Wall>India -Wdg-From-2l-With-Paved-Shoulder-To-4l-And-Steg-At-Km-33-0-To-40-0-Of-Avinashi-Tiruppur-Palladam-Pollachi-Cochin-Road-Via-Meenkarai-Including-Cd-Works-Reconstn-Of-Box-Culverts-Junction-Impts-And-Constn-Of-Reg-Wall>Tn 48 25 26 Tirupur Division Tpr 094
Wdg From 2l With Paved Shoulder To 4l And Steg At Km 33 0 To 40 0 Of Avinashi Tiruppur Palladam Pollachi Cochin Road Via Meenkarai Including Cd Works Reconstn Of Box Culverts Junction Impts And Constn Of Reg Wall
-Wdg-From-2l-With-Paved-Shoulder-To-4l-And-Steg-At-Km-33-0-To-40-0-Of-Avinashi-Tiruppur-Palladam-Pollachi-Cochin-Road-Via-Meenkarai-Including-Cd-Works-Reconstn-Of-Box-Culverts-Junction-Impts-And-Constn-Of-Reg-Wall>2026-02-07
India Arrangements Of Beside Street Lights And Minor Repairs To The Footpath From Apspdcl Office To Rtc Depo In Gokulam In Puttaparthi Municipality Under General Fund. 2026-02-07
India Overhauling And Servicing Of In-tank Oltc Make Easun-mr Oltc Oh Work, Overhauling Of Con.t/f Oltc Divt. Switch, T/f Oil Surge Relay, Oltc Arc Chute, Oltc Coupling Shaft Assy Wt Fuse, Oltc Top Drive Gear Box Assy, Oltc Cover Gearbox, Oltc Raise Lower Switc 2026-02-07
India Annual Maintenance Of Air Conditioning System At 400kv Receiving Station Amc Of Air Conditioner, Repair, Overhaul & Service-1.5/2t Split A.c., 2t A.c. Running Condensor, 2t A.c. Starting Condensor, 48v Split A.c. I/d Unit Digital Display, 1.5tr/2tr Split 2026-02-07
India The Project Involves The Outsourcing Of Nine Double-bedded Rooms And A Cafeteria At Authwatoo Bandipora For A Three-year Period On A License Basis. The Successful Bidder Will Be Responsible For The Maintenance And Management Of The Facility, Ensuring Comp 2026-02-07
India Provn Of Parking Shed For Ambulance At Mi Room And Fire Fighting Vehicle At Fire Safety Group At Defence Laboratory Jodhpur 2026-02-07
India Construction Of Road From Rampur Primary School Towards Kharber At Mouza - Rampur, J.l No- 17 In Dhaban Gram Panchayat Under Chhatna Development Block Within Bankura District For The Year 2025 - 26. 2026-02-07
-Widening-From-Two-Lane-With-Paved-Shoulders-To-Four-Lane-And-Strengthening-At-Km-5/2-9/075-Of-Perambalur-Byepass-Road-Including-Widening-Of-Box-Culverts,construction-Of-Retaining-Wall,-Junction-Impr>India -Widening-From-Two-Lane-With-Paved-Shoulders-To-Four-Lane-And-Strengthening-At-Km-5/2-9/075-Of-Perambalur-Byepass-Road-Including-Widening-Of-Box-Culverts,construction-Of-Retaining-Wall,-Junction-Impr>Try-98/2026-27 Perambalur (h) C And M Sub Division
Widening From Two Lane With Paved Shoulders To Four Lane And Strengthening At Km 5/2-9/075 Of Perambalur Byepass Road Including Widening Of Box Culverts,construction Of Retaining Wall, Junction Impr
-Widening-From-Two-Lane-With-Paved-Shoulders-To-Four-Lane-And-Strengthening-At-Km-5/2-9/075-Of-Perambalur-Byepass-Road-Including-Widening-Of-Box-Culverts,construction-Of-Retaining-Wall,-Junction-Impr>2026-02-07
-Widening-From-Tl-With-Paved-Shoulders-To-Fl-And-Strengthening-At-Km-49/6-51/8-Of-Athur---Perambalur-Road-Including-Reconstruction-Of-Box-Culverts,-Construction-Of-Drain,-Retaining-Wall,junction-Impro>India -Widening-From-Tl-With-Paved-Shoulders-To-Fl-And-Strengthening-At-Km-49/6-51/8-Of-Athur---Perambalur-Road-Including-Reconstruction-Of-Box-Culverts,-Construction-Of-Drain,-Retaining-Wall,junction-Impro>Try 99/2026-27 Perambalur (h) C And M Subdivision
Widening From Tl With Paved Shoulders To Fl And Strengthening At Km 49/6-51/8 Of Athur - Perambalur Road Including Reconstruction Of Box Culverts, Construction Of Drain, Retaining Wall,junction Impro
-Widening-From-Tl-With-Paved-Shoulders-To-Fl-And-Strengthening-At-Km-49/6-51/8-Of-Athur---Perambalur-Road-Including-Reconstruction-Of-Box-Culverts,-Construction-Of-Drain,-Retaining-Wall,junction-Impro>2026-02-07
Whats app