Filter Search


Transportation


Location Summary Deadline
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-14/6-16/8,-19/8-21/6-And-Widening-From-Two-Lane-With-Paved-Shoulder-To-Four-Lane-And-Strengthening-At-Km-16/8-19/8-Of-Arcot-Tindivanam-Road-(sh-5)>India -Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-14/6-16/8,-19/8-21/6-And-Widening-From-Two-Lane-With-Paved-Shoulder-To-Four-Lane-And-Strengthening-At-Km-16/8-19/8-Of-Arcot-Tindivanam-Road-(sh-5)>Tn No 74 2025 26 Hdo Dt 20 01 2026 Tvm 182
Widening From Two Lane To Four Lane And Strengthening At Km 14/6-16/8, 19/8-21/6 And Widening From Two Lane With Paved Shoulder To Four Lane And Strengthening At Km 16/8-19/8 Of Arcot Tindivanam Road (sh-5)
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-14/6-16/8,-19/8-21/6-And-Widening-From-Two-Lane-With-Paved-Shoulder-To-Four-Lane-And-Strengthening-At-Km-16/8-19/8-Of-Arcot-Tindivanam-Road-(sh-5)>2026-02-07
-Widening-From-Two-Lane-With-Paved-Shoulder-To-Four-Lane-And-Strengthening-At-Km-3/0---7/0-Of-Kannamangalam---Arni-Road-Including-Reconstruction-And-Widening-Of-Culverts,-Construction-Of-Drain,-Center-Median>India -Widening-From-Two-Lane-With-Paved-Shoulder-To-Four-Lane-And-Strengthening-At-Km-3/0---7/0-Of-Kannamangalam---Arni-Road-Including-Reconstruction-And-Widening-Of-Culverts,-Construction-Of-Drain,-Center-Median>Tn No 74 2025 26 Hdo Dt 20 01 2026 Tvm 183
Widening From Two Lane With Paved Shoulder To Four Lane And Strengthening At Km 3/0 - 7/0 Of Kannamangalam - Arni Road Including Reconstruction And Widening Of Culverts, Construction Of Drain, Center Median
-Widening-From-Two-Lane-With-Paved-Shoulder-To-Four-Lane-And-Strengthening-At-Km-3/0---7/0-Of-Kannamangalam---Arni-Road-Including-Reconstruction-And-Widening-Of-Culverts,-Construction-Of-Drain,-Center-Median>2026-02-07
India Construction Of Cc Approach Road For 06 (six) Nos Of Weigh Bridge, 04 (four) Nos Of Qds And Control Room Pedestal Of 06 (six) Nos Of Weigh Bridge And Dg Shed With Pedestal For 03 (three) Nos At Da-2 Area Of Kurmitar Iron Ore Mines In The District Of 2026-02-07
India Strengthening Works To The Government Roads In Thanjavur And Pattukkottai H Cm Sub Division Jurisdiction Tnj 105 2026-02-07
-Improvements-And-Resurface-Of-Road-In-Harohalli,maralwadi,hunsanahalli,kodihalli,sathnuru,kabbalu,channapatana-To-Join-Sh-33-From-Ch.46.50-Km-To-Ch.50.00-Km-In-Kanakapura-Taluk-Bengaluru-South-District>India -Improvements-And-Resurface-Of-Road-In-Harohalli,maralwadi,hunsanahalli,kodihalli,sathnuru,kabbalu,channapatana-To-Join-Sh-33-From-Ch.46.50-Km-To-Ch.50.00-Km-In-Kanakapura-Taluk-Bengaluru-South-District>Improvements And Resurface Of Road
Improvements And Resurface Of Road In Harohalli,maralwadi,hunsanahalli,kodihalli,sathnuru,kabbalu,channapatana To Join Sh-33 From Ch.46.50 Km To Ch.50.00 Km In Kanakapura Taluk Bengaluru South District
-Improvements-And-Resurface-Of-Road-In-Harohalli,maralwadi,hunsanahalli,kodihalli,sathnuru,kabbalu,channapatana-To-Join-Sh-33-From-Ch.46.50-Km-To-Ch.50.00-Km-In-Kanakapura-Taluk-Bengaluru-South-District>2026-02-07
-Improvements-And-Resurface-Of-Bengaluru-Dindigal-Nh-Of-Honniganahalli,-Harihara,-Bhoohalli-Near-Nayakanahalli-To-Join-Kodihalli---Sathnuru-Road-From-Ch.2.50km-(harihara)-To-Ch.4.20km-(bhoohalli)-And-Ch.4.60-Km-(bhoohalli-)>India -Improvements-And-Resurface-Of-Bengaluru-Dindigal-Nh-Of-Honniganahalli,-Harihara,-Bhoohalli-Near-Nayakanahalli-To-Join-Kodihalli---Sathnuru-Road-From-Ch.2.50km-(harihara)-To-Ch.4.20km-(bhoohalli)-And-Ch.4.60-Km-(bhoohalli-)>Improvements And Resurface
Improvements And Resurface Of Bengaluru Dindigal Nh Of Honniganahalli, Harihara, Bhoohalli Near Nayakanahalli To Join Kodihalli - Sathnuru Road From Ch.2.50km (harihara) To Ch.4.20km (bhoohalli) And Ch.4.60 Km (bhoohalli )
-Improvements-And-Resurface-Of-Bengaluru-Dindigal-Nh-Of-Honniganahalli,-Harihara,-Bhoohalli-Near-Nayakanahalli-To-Join-Kodihalli---Sathnuru-Road-From-Ch.2.50km-(harihara)-To-Ch.4.20km-(bhoohalli)-And-Ch.4.60-Km-(bhoohalli-)>2026-02-07
-Improvements-And-Resurface-From-Bannimukodlu-Via-Honniganahalli,mugguru-To-Join-Kabballayanadoddi-From-Ch.0.00km-(bannimukodlu)-To-Ch.-5.50-Km-(honniganahalli)-In-Kanakapura-Taluk-Bengaluru-South-District>India -Improvements-And-Resurface-From-Bannimukodlu-Via-Honniganahalli,mugguru-To-Join-Kabballayanadoddi-From-Ch.0.00km-(bannimukodlu)-To-Ch.-5.50-Km-(honniganahalli)-In-Kanakapura-Taluk-Bengaluru-South-District>Improvements And Resurface
Improvements And Resurface From Bannimukodlu Via Honniganahalli,mugguru To Join Kabballayanadoddi From Ch.0.00km (bannimukodlu) To Ch. 5.50 Km (honniganahalli) In Kanakapura Taluk Bengaluru South District
-Improvements-And-Resurface-From-Bannimukodlu-Via-Honniganahalli,mugguru-To-Join-Kabballayanadoddi-From-Ch.0.00km-(bannimukodlu)-To-Ch.-5.50-Km-(honniganahalli)-In-Kanakapura-Taluk-Bengaluru-South-District>2026-02-07
India Improvements Of Road To Channapattana-sheetalavadi Road From Ch 19.50km Adanakuppe To 21.00km Maavatthuru Kere Bande In Kanakapura Taluk, Bengaluru South Dist.(working Ch 19.78km To 21.00km) 2026-02-07
-Improvements-And-Resurface-Of-Road-From-Aluru-siddapura(somavarapete-Taluk)-To-Sathnuru-(kanakapura-Taluk)-Sh-279-At-Chainage-256.52-Km-Forest-Checkpost-Bhuhalli-To-Chainage-263.02-Km-Sathnur-In-Kanakapura-Taluk-Be>India -Improvements-And-Resurface-Of-Road-From-Aluru-siddapura(somavarapete-Taluk)-To-Sathnuru-(kanakapura-Taluk)-Sh-279-At-Chainage-256.52-Km-Forest-Checkpost-Bhuhalli-To-Chainage-263.02-Km-Sathnur-In-Kanakapura-Taluk-Be>Improvements And Resurface Of Road
Improvements And Resurface Of Road From Aluru-siddapura(somavarapete Taluk) To Sathnuru (kanakapura Taluk) Sh-279 At Chainage 256.52 Km Forest Checkpost Bhuhalli To Chainage 263.02 Km Sathnur In Kanakapura Taluk Be
-Improvements-And-Resurface-Of-Road-From-Aluru-siddapura(somavarapete-Taluk)-To-Sathnuru-(kanakapura-Taluk)-Sh-279-At-Chainage-256.52-Km-Forest-Checkpost-Bhuhalli-To-Chainage-263.02-Km-Sathnur-In-Kanakapura-Taluk-Be>2026-02-07
India Supply Of Books To The Library Of Vidyasagar College. 2026-02-07
Whats app