Filter Search


Transportation


Location Summary Deadline
India Repair Cc Road From Sh-9 To Shib Mandir Jl No 235 Mouza Bikna Under Bikna Gp , Scheme Id - Apas-01-254-8-0005 Sl-32 2025-09-18
India Repair Cc Road At Bikna Asram Para Road Jl No 235 Mouza Bikna Under Bikna Gp, Scheme Id - Apas-01-254-8-0006 Sl-33 2025-09-18
-Refurbishment-Of-Content-Creation,-Epic-Room-1-And-2-Distruptive-Tech-Lab-Center-Dt-Data-Lab-Instrument-Lab-At-Juhu-And-Epic-Pedagogy-Room-Epic-Ict-Integration-Room-Epic-Audio-Recording-Room-Epic-Video-Recording-Room-And-Passage-At>India -Refurbishment-Of-Content-Creation,-Epic-Room-1-And-2-Distruptive-Tech-Lab-Center-Dt-Data-Lab-Instrument-Lab-At-Juhu-And-Epic-Pedagogy-Room-Epic-Ict-Integration-Room-Epic-Audio-Recording-Room-Epic-Video-Recording-Room-And-Passage-At>Sppwnit 19 Aarey
Refurbishment Of Content Creation, Epic Room 1 And 2 Distruptive Tech Lab Center Dt Data Lab Instrument Lab At Juhu And Epic Pedagogy Room Epic Ict Integration Room Epic Audio Recording Room Epic Video Recording Room And Passage At
-Refurbishment-Of-Content-Creation,-Epic-Room-1-And-2-Distruptive-Tech-Lab-Center-Dt-Data-Lab-Instrument-Lab-At-Juhu-And-Epic-Pedagogy-Room-Epic-Ict-Integration-Room-Epic-Audio-Recording-Room-Epic-Video-Recording-Room-And-Passage-At>2025-09-18
-(sh.-C/o-R/wall-In-Pcc-1.4.8-At-Rd-0/500-To-0/516)-Under-Pdna>India -(sh.-C/o-R/wall-In-Pcc-1.4.8-At-Rd-0/500-To-0/516)-Under-Pdna>Restoration Of Rain Damages On Link Road From Kando Dugana To Shamah Pamta Km 0/0 To 5/870. (sh. C/o R/wall In Pcc 1.4.8 At Rd 0/500 To 0/516) Under Pdna
(sh. C/o R/wall In Pcc 1.4.8 At Rd 0/500 To 0/516) Under Pdna
-(sh.-C/o-R/wall-In-Pcc-1.4.8-At-Rd-0/500-To-0/516)-Under-Pdna>2025-09-18
-(sh.-C/o-R/wall-In-Pcc-1.4.8-At-Rd-9/340-To-9/357-)under-Pdna>India -(sh.-C/o-R/wall-In-Pcc-1.4.8-At-Rd-9/340-To-9/357-)under-Pdna>Restoration Of Rain Damages On Sataun Pocca Kando Kotga Road Km 0.0 To 11/00. (sh. C/o R/wall In Pcc 1.4.8 At Rd 9/340 To 9/357 )under Pdna
(sh. C/o R/wall In Pcc 1.4.8 At Rd 9/340 To 9/357 )under Pdna
-(sh.-C/o-R/wall-In-Pcc-1.4.8-At-Rd-9/340-To-9/357-)under-Pdna>2025-09-18
-(sh.-C/o-B/wall-In-A-Wire-Crate-At-Rd-0/280-To-0/335)-Under-Pdna>India -(sh.-C/o-B/wall-In-A-Wire-Crate-At-Rd-0/280-To-0/335)-Under-Pdna>Restoration Of Rain Damages On Kinnu Kulah Road Km 0.0 To 3/00. (sh. C/o B/wall In A Wire Crate At Rd 0/280 To 0/335) Under Pdna
(sh. C/o B/wall In A Wire Crate At Rd 0/280 To 0/335) Under Pdna
-(sh.-C/o-B/wall-In-A-Wire-Crate-At-Rd-0/280-To-0/335)-Under-Pdna>2025-09-18
India Restoration Of Rain Damages On Dada Siba Daulatpur Road Km 000 To 9000shconst Of Protection Work In Wire Crates At Rd 5250 To 5278 And Retaining Wall At Rd 5300 To 5330 And 7000 To 7300 Under Pdna2023 2025-09-18
India R/r Damages On Link Road From Labrang Bus Stand To Labrang Gompa Km. 0/00 To 1/600 (sh- C/o R/wall In R.r. Masonry At Rd. 1/485 To 1/500 2025-09-18
India Interlocking Lagvayi Nirman Karya Rajkiy Uchch Madhyamik Vidyalay Bhuteri 2025-09-18
India The Work Involves The Collection Of Wet And Dry Waste From Households And Commercial Establishments, Transporting It To The Designated Waste Collection Site (dumping Yard), And Includes The Provision Of Necessary Equipment, Safety Gear, And Medical Kits B 2025-09-18
Whats app