Filter Search


Transportation


Location Summary Deadline
India Construction Of Paver Road From Khariar Public School Towards Maruti Nagar In Ward No.02 2026-01-27
India Tender Invited For Wooden Pole For 6 Ft X 6 Ft Tgt Size 2 Ft X 2 Ft Length 12 Ft , Wooden Pole For 6 Ft X 6 Ft Tgt Size 2 Ft X 2 Ft Length 10 Ft , Hessian Cloth , Tgt Paper Fir 1 Ft X 1 Ft , Bunker Tgt Paper 4 Ft X 4 Ft , Combat Tgt Paper 4 Ft X 4ft , Nai 2026-01-27
India Improvement Of Kalivilakam Anganwadi, Maintenance Of Panchayath Office Record Room, Renovation Of Valicode Pallithara Road, Infrastructure Developments To Malayora Highway Rehabilitation Project- Phase Ii, Improvements To Krishi Bhavan Ward, Improvements 2026-01-27
India The Tender Involves The Supply Of Tab Washer Part No 60-862, Which Is Required For Aviation Purposes In Defense Aircraft. The Work Includes Ensuring Compliance With Local Content Requirements For Qualifying As Class 1 And Class 2 Local Suppliers. Tab Wash 2026-01-27
-Works-For-Preparation-Of-Stock-Map-On-Mouza-Map-In-Co>India -Works-For-Preparation-Of-Stock-Map-On-Mouza-Map-In-Co>Wbfor/wp (s)ii/dfo/niet11_2025-26 (2nd Call),works For Preparation Of Stock Map On Mouza Map In Connection With Preparation Of Part-iii Of Working Plan Of Birbhum Division During The F.y. 2025-26
Works For Preparation Of Stock Map On Mouza Map In Co
-Works-For-Preparation-Of-Stock-Map-On-Mouza-Map-In-Co>2026-01-27
-Pandua-kulti-Road-From-0.81-Km-To-1.79-Km-And-2.40-Km-To-2.60-Km-(in-Stretches)-Maintenance-And-Repairing-Work-Under-Burdwan-South-Highway-Division-During-The-Year-2025-26>India -Pandua-kulti-Road-From-0.81-Km-To-1.79-Km-And-2.40-Km-To-2.60-Km-(in-Stretches)-Maintenance-And-Repairing-Work-Under-Burdwan-South-Highway-Division-During-The-Year-2025-26>Wbpwd/rd/ee/bshd/nit17/25-26/2
Pandua-kulti Road From 0.81 Km To 1.79 Km And 2.40 Km To 2.60 Km (in Stretches) Maintenance And Repairing Work Under Burdwan South Highway Division During The Year 2025-26
-Pandua-kulti-Road-From-0.81-Km-To-1.79-Km-And-2.40-Km-To-2.60-Km-(in-Stretches)-Maintenance-And-Repairing-Work-Under-Burdwan-South-Highway-Division-During-The-Year-2025-26>2026-01-27
-Debpur-Bus-Stand-To-Debpur-Road-From-0.00-Km-To-1.00-Km-repairing-And-Maintenance-Of-Road-Surface-Under-Kalna-Highway-Sub-Division-Of-Burdwan-South-Highway-Division,-P.w.(roads)-Dte-During-The-Year-2025-26-(2nd-Call)>India -Debpur-Bus-Stand-To-Debpur-Road-From-0.00-Km-To-1.00-Km-repairing-And-Maintenance-Of-Road-Surface-Under-Kalna-Highway-Sub-Division-Of-Burdwan-South-Highway-Division,-P.w.(roads)-Dte-During-The-Year-2025-26-(2nd-Call)>Wbpwd/rd/ee/bshd/nit17/25-26/3
Debpur Bus Stand To Debpur Road From 0.00 Km To 1.00 Km-repairing And Maintenance Of Road Surface Under Kalna Highway Sub Division Of Burdwan South Highway Division, P.w.(roads) Dte During The Year 2025-26 (2nd Call)
-Debpur-Bus-Stand-To-Debpur-Road-From-0.00-Km-To-1.00-Km-repairing-And-Maintenance-Of-Road-Surface-Under-Kalna-Highway-Sub-Division-Of-Burdwan-South-Highway-Division,-P.w.(roads)-Dte-During-The-Year-2025-26-(2nd-Call)>2026-01-27
India Construction Of Paver Road From Gokul Nagar Club Towards Tribandh In Ward No.09 2026-01-27
-Emergent-Patch-Repairing-Work-Of-Bolerhalt-Railway-Station-Link-Road-From-0.00-Kmp-To-2.00-Kmp-Under-Nabadwip-Highway-Sub-Division-Of-Burdwan-South-Highway-Division,-In-The-District-Of-Purba-Bardhaman-During-The-Year-2>India -Emergent-Patch-Repairing-Work-Of-Bolerhalt-Railway-Station-Link-Road-From-0.00-Kmp-To-2.00-Kmp-Under-Nabadwip-Highway-Sub-Division-Of-Burdwan-South-Highway-Division,-In-The-District-Of-Purba-Bardhaman-During-The-Year-2>Wbpwd/rd/ee/bshd/nit17/25-26/4
Emergent Patch Repairing Work Of Bolerhalt Railway Station Link Road From 0.00 Kmp To 2.00 Kmp Under Nabadwip Highway Sub Division Of Burdwan South Highway Division, In The District Of Purba Bardhaman During The Year 2
-Emergent-Patch-Repairing-Work-Of-Bolerhalt-Railway-Station-Link-Road-From-0.00-Kmp-To-2.00-Kmp-Under-Nabadwip-Highway-Sub-Division-Of-Burdwan-South-Highway-Division,-In-The-District-Of-Purba-Bardhaman-During-The-Year-2>2026-01-27
India Completion Of Paver Road From Khage Kumar House Towards Jatish Kumar House At Ward No.13 2026-01-27
Whats app