Filter Search


Transportation


Location Summary Deadline
India Inspection Door In Roof Ceiling For Amrit Bharat Coaches .#* Inspection Door In Roof Ceiling For Amrit Bharat Coaches. Colour Shade Sh all Be Ral 090-9005., As Per Drawing: Icf/sk3-4-4-034 Alt Br Col-iii, Packing Instruction: All Type s Of Aluminium/stain 2025-10-06
Saudi Arabia Construction, Operation And Maintenance Of A Commercial Mass Transportation Complex - Commercial Activities - Commercial Stores - Commercial Complex 2025-10-06
Tunisia In-flight Inspection Of Air Navigation Aids 2025-10-06
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Rehabilitation-And-Up-Gr>India -Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Rehabilitation-And-Up-Gr>Consultancy Services For Preparation Of Detailed Project Report (dpr) For Rehabilitation And Up Gradation To 4lps Of Nh-220 In The State Of Jharkhand.
Consultancy Services For Preparation Of Detailed Project Report (dpr) For Rehabilitation And Up Gr
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Rehabilitation-And-Up-Gr>2025-10-06
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Widening-And-Stre>India -Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Widening-And-Stre>Consultancy Services For Preparation Of Detailed Project Report (dpr) For Widening And Strengthening To 2lps Of Nh-133a And Nh-333a In The State Of Jharkhand
Consultancy Services For Preparation Of Detailed Project Report (dpr) For Widening And Stre
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Widening-And-Stre>2025-10-06
-Construction-Of-New-Major-Bridge-Over-Indravati-At-Km-302.280-Of-Nh-26-In-The-State-Of-Odisha-On-Epc-Mode>India -Construction-Of-New-Major-Bridge-Over-Indravati-At-Km-302.280-Of-Nh-26-In-The-State-Of-Odisha-On-Epc-Mode>Construction Of New Major Bridge Over Indravati At Km 302.280 Of Nh-26 In The State Of Odisha On Epc Mode
Construction Of New Major Bridge Over Indravati At Km 302.280 Of Nh-26 In The State Of Odisha On Epc Mode
-Construction-Of-New-Major-Bridge-Over-Indravati-At-Km-302.280-Of-Nh-26-In-The-State-Of-Odisha-On-Epc-Mode>2025-10-06
India Pantograph Mounting Insulator. .#* Pantograph Mounting Insulator As Per Clw Drg.no.clw/es/sk-4/ac/i-1/k And Confir ming To Clw Specification Clw/es/ac/i-1 Alt.k. [ Warranty Period: 30 Months After The Date Of Deliver y ] ] 2025-10-06
India Polymer Buffer Spring Pack Set. (consisting Of 3 Items). .#* Polymer Buffer Spring Pack Set. (consisting Of 3 Items) To Icf Drg. No. Icf/std-2-2-015 Alt- a/nil, Col-ii, Item Nos. 16, 17 & 18. Material & Spec. As Per Icf/md/spec-353 With Amdt.1 Of August 2 2025-10-06
India Supply, Installation And Commissioning Of Inter Coach Gangway With Flexible Interior System Furnishing. .#* Supply, Installation And Commissioning Of Inter Coach Gangway With Flexible Interior System Furnishing (including Vestibule Foot Plate) For Lhb ( t 2025-10-06
India Pl No. 25121730 - Equaliser (modified) Of Wag7 Loco Etc. .#* Equaliser (modified) Of Wag7 Loco As Per Clws Drg. No.- 06/2/15/62 (alt.-0). [ Warranty period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal 2025-10-06
Whats app