Filter Search


Transportation


Location Summary Deadline
India Construction Of Devider Railing At Satai 2025-10-04
Czech Republic Libuš - Nová Dvory Tram Line, Contractor Selection 2025-10-04
India Tractor Trolley Supply 2025-10-04
India Consultancy Services For Survey, Investigation, Improvement Of Water Use Efficiency In Malprabha Canal System, Preparation Of Detailed Estimates, Package Estimate & Dtp For The Work Extension, Renovation And Modernization Of Malprabha Canal System For Rem 2025-10-04
India Tender Invited For Custom Bid For Services - Operational Assistance In Ash Handling System Of Unit 7,8,9 And 10 .#* Support Services##quantity: 1## 2025-10-04
India Appointment Of Architects Cum Project Consultant For Proposed Civil Work, Interior Furnishing Work, Electrical Work With Networking And Air-conditioning Work At Bank Of India Building 1st Floor At Ghoddod Road, Surat. The Firm Must Have Minimum 7 Years’ E 2025-10-04
India Handling And Disposal Of Ink Sludge Through Cement Kiln For Co-processing/alternate Fuel For Raw Material Processing Unit/incinerator. The Contractor Is Required To Start The Work Within 4 Weeks From The Date Of Placing Of Notification Of Award Of Contrac 2025-10-04
India Kit For Ep Brake Unit .#* Kit For Ep Brake Unit Level -ii As Per Ftil Part No. Ft 0051314-k01. As Per Anne xure Attached [set Consisting 08 Items] [ Warranty Period: 30 Months After The Date Of Deliver y ] ] 2025-10-04
India Bogie Bolster Arrangement. .#* Bogie Bolster Arrangement. Drawing No.:- T-0-4-654 , Alt (h) & (4) ( Sheet 1&2) Sp ecification:- Rdso- C -9202 (rev.-2) [ Warranty Period: 60 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Categ 2025-10-04
India Isolating Cock [for Acp Isolating] For Lhb Coaches Part No .#* Isolating Cock [for Acp Isolating] For Lhb Coaches Part No.:-ermeto Part. N o. Kh28l Or Equivalent. [drawing No.lw 36137 Alt A Sheet 2/2, Item No.79] [ Warranty Perio d: 30 Months After The Da 2025-10-04
Whats app