Filter Search


Transportation


Location Summary Deadline
India The Project Involves The Manufacture And Supply Of Gr Sole Plates Designed For A Specific Railway Crossing Configuration, Ensuring Compatibility With 52 Kg Rails On Psc Sleepers, Adhering To The Latest Rdso Layout Specifications. Gr Sole Plate 2026-01-20
-Upgradation-Of-C.c-Road-From-H/o-Ananda-Modak-To-H/o-Harikar-Barman.(length-94.00-M-Width-2.40-M)-Booth-No-25/191-At-Patharghata-G.p>India -Upgradation-Of-C.c-Road-From-H/o-Ananda-Modak-To-H/o-Harikar-Barman.(length-94.00-M-Width-2.40-M)-Booth-No-25/191-At-Patharghata-G.p>85/apas/mtg/bdo/25-26/2nd, 06.01.26
Upgradation Of C.c Road From H/o Ananda Modak To H/o Harikar Barman.(length 94.00 M Width-2.40 M) Booth No-25/191 At Patharghata G.p
-Upgradation-Of-C.c-Road-From-H/o-Ananda-Modak-To-H/o-Harikar-Barman.(length-94.00-M-Width-2.40-M)-Booth-No-25/191-At-Patharghata-G.p>2026-01-20
-Upgradation-Of-C.c-Road-From-H/o-Ananta-Roy-To-H/o-Prafulla-Roy-Via-Amal-Barmans-House.-(length-94.00-M-Width-2.40-M)-Booth-No-25/191-At-Patharghata-G.p>India -Upgradation-Of-C.c-Road-From-H/o-Ananta-Roy-To-H/o-Prafulla-Roy-Via-Amal-Barmans-House.-(length-94.00-M-Width-2.40-M)-Booth-No-25/191-At-Patharghata-G.p>85/apas/mtg/bdo/25-26/2nd, 06.01.26
Upgradation Of C.c Road From H/o Ananta Roy To H/o Prafulla Roy Via Amal Barmans House. (length 94.00 M Width-2.40 M) Booth No-25/191 At Patharghata G.p
-Upgradation-Of-C.c-Road-From-H/o-Ananta-Roy-To-H/o-Prafulla-Roy-Via-Amal-Barmans-House.-(length-94.00-M-Width-2.40-M)-Booth-No-25/191-At-Patharghata-G.p>2026-01-20
India Construction Of Unfinished Portion Of Control Room Building, Switchyard, Road, Surface Drain, Power Cable And Control Cable Trench, Spreading Of Gravels Along With Allied Civil Works Of Baneswar 33/11 Kv Ss Under Coochbehar Division Wbsedcl 2026-01-20
India The Project Involves Mechanical Works Including The Fabrication And Installation Of Piping Systems, Along With Associated Mechanical, Electrical, And Instrumentation Tasks For The Lupech (j-18) Project At The Iocl Gujarat Refinery. The Scope Includes Dism 2026-01-20
-Construction-Of-Pathway-To-Ghat-At-Chainage-256.40-Zero-Bridge-Tipri-Road-For-Nearby-Villagers.>India -Construction-Of-Pathway-To-Ghat-At-Chainage-256.40-Zero-Bridge-Tipri-Road-For-Nearby-Villagers.>Construction Of Pathway To Ghat At Chainage 256.40 Zero Bridge Tipri Road For Nearby Villagers.
Construction Of Pathway To Ghat At Chainage 256.40 Zero Bridge Tipri Road For Nearby Villagers.
-Construction-Of-Pathway-To-Ghat-At-Chainage-256.40-Zero-Bridge-Tipri-Road-For-Nearby-Villagers.>2026-01-20
India Temporary And Contractual Engagement Of One Skilled Outsourced Driver For Food Safety On Wheel For The Cmoh, Kalimpong Gta 2026-01-20
India Construction Of The Road From Lauhati Hdfc Bank To Jamalpara Play Ground Under Rajarhat Block. Pavement, Traffic & Safety, Cd & Drain 2026-01-20
-Onstruction-Of-New-Cc-Road-From-Banharishpur-Mollapara-Maszidtola-To-Eansan-Mollar-House-200ft,-Jl-4>India -Onstruction-Of-New-Cc-Road-From-Banharishpur-Mollapara-Maszidtola-To-Eansan-Mollar-House-200ft,-Jl-4>Onstruction Of New Cc Road From Banharishpur Mollapara Maszidtola To Eansan Mollar House 200ft Jl 4
Onstruction Of New Cc Road From Banharishpur Mollapara Maszidtola To Eansan Mollar House 200ft, Jl 4
-Onstruction-Of-New-Cc-Road-From-Banharishpur-Mollapara-Maszidtola-To-Eansan-Mollar-House-200ft,-Jl-4>2026-01-20
India Onstruction Of New Cc Road From Main Road To Japan Malick House 150ft 2026-01-20
Whats app