Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Improvement-Of-Electrical-Wiring-And-Other-Necessary-Electrical-Accessories-At-17,-No.-D.-L.-Khan-Road-Community-Hall-In-Ward-71.>India -Improvement-Of-Electrical-Wiring-And-Other-Necessary-Electrical-Accessories-At-17,-No.-D.-L.-Khan-Road-Community-Hall-In-Ward-71.>Kmc/ltg/b-9/apas/71/25-26/62
Improvement Of Electrical Wiring And Other Necessary Electrical Accessories At 17, No. D. L. Khan Road Community Hall In Ward-71.
-Improvement-Of-Electrical-Wiring-And-Other-Necessary-Electrical-Accessories-At-17,-No.-D.-L.-Khan-Road-Community-Hall-In-Ward-71.>2025-12-30
India Provision Of 02 Nos. Light Rob In Connection With Track Safety Work Under aden/jhd. 2025-12-30
-Improvement-Of-Street-Lighting-System-At-113-Chetla-Road-In-Ward-No-82.>India -Improvement-Of-Street-Lighting-System-At-113-Chetla-Road-In-Ward-No-82.>Kmc/ltg/b-9/apas/82/25-26/55
Improvement Of Street Lighting System At 113 Chetla Road In Ward No-82.
-Improvement-Of-Street-Lighting-System-At-113-Chetla-Road-In-Ward-No-82.>2025-12-30
India Provision Of Type-ii Quarters At Neora, Kulharia, Bihiya And Dheena (04 Nos) For trackman And Construction Of 10 Bed Barrack For On Duty Rpf Staff At Bihta railway Station In Sr.den/3/dnr Section. 2025-12-30
India Design, Supply, Erection, Testing And Commissioning Of Railway Electrification work Of 1x25kv Psi System In Abr-trah Section Of Ajmer Division, Nwr In connection With New Line Work. 2025-12-30
India Construction Of New Building For Shifting Of S&t Gears At Km 78/3 (lc Gate No.9) between Kaman-juchandra. 2025-12-30
India Supply And Installation Testing & Commissioning Of Tower Air Conditioner Unit Nominal Cooling Capacity 04 Ton/12000 Kcal/ per Hr. Or 48000 Btu/hr. Floor Standing Type Split Air Conditioner, Supply Voltage 3 Phase 415 Volt +/- 5% Ac, 50 Hz. (technology Of 2025-12-30
India A Marker Led Signal Unit .#* A Marker Led Signal Unit 110v Ac Retrofittable In Existing Cls Housing With Ac Led Ecr/ac C onvention. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-30
India Construction Of 10 Units Rb-v Quarters (g+5) In Rail Saurabh Colony (phase-1) At jabalpur Under Assistant Divisional Engineer/hq/jabalpur Sub Division. [ Scope Of work Reduced G+5 To G+4 (8 Units Rb-v Quarters) As Work Sanctioned By Railway board With Red 2025-12-30
India "(1) Construction Of Ladies Changing Room With Toilet/bathroom At Rpf Post/out post, Gondia And Dongargarh. (2) Construction Rcc Road For The Station Approach at Dhanoli Station Under The Jurisdiction Of Aden/gondia. (3) Provision Of 01 Nos pressure Filte 2025-12-30
Whats app