Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Fitting Fixing Of Partition Wall And Supply Installation Of Room A.c. Machine With Allied Electrical Works Etc. At The Office Of The Se(ai), Bankura(a-i) Circle At Wridd Adminstrative Building, Bankura Under Non Plan Fund. 2025-05-10
India Construction Of Community Hall Near Narrah Mondal Para Saraswati Mela, Mouza- Narrah, Jl No- 275, Plot No- 213, Under 5 Th Sfc Fund 2024-2025 Sl-9 2025-05-10
qty:10
>India
qty:10
>Tender Invited For Steel Porta Cabin (q3)
qty:10
qty:10
>2025-05-10
qty:47
>India
qty:47
>Tender Invited For Entry Mid Level Desktop Computer (q2), Line Interactive Ups With Avr (v2) (q2)
qty:47
qty:47
>2025-05-10
Ukraine Elements Of Electrical Circuits 2025-05-10
India Setting Up New Street Light Under Sansad 2 At Gurbari-1 Gp Code-120855301 2025-05-10
India Civil And Electrical Maintenance & Repair Work Under Pune Retail Region For Pune 1&2 Sa. 2025-05-10
India Drilling Of Borewell Fixing Of Motor Syntex And Pipeline In Ward No 10 14 16 20 21 In Maski Tmc Limits 2025-05-10
-A-Set-Of-Items-For-Rectifier-Unit-And-E.-Beam-Cable-For-Pit-No.10-&-11-At-Emu-Carshed-Howrah-As-Per-Annexure-[-Warranty-Period:-30-Months-After-The-Date-Of-De>India -A-Set-Of-Items-For-Rectifier-Unit-And-E.-Beam-Cable-For-Pit-No.10-&-11-At-Emu-Carshed-Howrah-As-Per-Annexure-[-Warranty-Period:-30-Months-After-The-Date-Of-De>Tender Invited For A Set Of Items For Rectifier Unit And E. Beam Cable For Pit No.10 & 11.
A Set Of Items For Rectifier Unit And E. Beam Cable For Pit No.10 & 11 At Emu Carshed Howrah As Per Annexure [ Warranty Period: 30 Months After The Date Of De
-A-Set-Of-Items-For-Rectifier-Unit-And-E.-Beam-Cable-For-Pit-No.10-&-11-At-Emu-Carshed-Howrah-As-Per-Annexure-[-Warranty-Period:-30-Months-After-The-Date-Of-De>2025-05-10
-Supply-&-Fixing-Of-60w-Led-Street-Light-For-The-Pole-16-Nos.-With-Supply-&-Fixing-Of-300w-Ledflood-Light-For-High-Mast-Tower-20m-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Supply-&-Fixing-Of-60w-Led-Street-Light-For-The-Pole-16-Nos.-With-Supply-&-Fixing-Of-300w-Ledflood-Light-For-High-Mast-Tower-20m-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Supply & Fixing Of 60w Led Street Light.
Supply & Fixing Of 60w Led Street Light For The Pole 16 Nos. With Supply & Fixing Of 300w Ledflood Light For High Mast Tower 20m [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Supply-&-Fixing-Of-60w-Led-Street-Light-For-The-Pole-16-Nos.-With-Supply-&-Fixing-Of-300w-Ledflood-Light-For-High-Mast-Tower-20m-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-10
Whats app