Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Poland Construction Of A Cogeneration Aggregate And A Biogas Reservoir At A Sewage Treatment Plant In Krosno 2025-06-30
India 110 Kv (e) Grade, Single Core, 400 Sq.mm. Copper Conductor Xlpe Cable .#* 110 Kv (e) Grade, Single Core, 400 Sq.mm Copper Conductor, Xlpe Insulated, Corrugate d Alluminium Sheathed, Alluminium Round Wire Armoured Hdpe Sheathed And Overall Graphite Cable A 2025-06-30
India Battery Operated Led Based Torch Light .#* Battery Operated Led Based Torch Light Cum Flashing Hand Signal Lamp As Per Rdso Specification No. Spn/195/20 08 Rev-2.2 (with Cells). [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance 2025-06-30
India Lamp Assembly For Automatic Door System .#* Lamp Assembly For Automatic Door System Fitted In Ac Emu Rakes As Per Kbil part No. 3ed99041r25_c04 Or As Per Drawing No. Wr/sk/e/swg-1144 [ Warranty Period: 30 Month s After The Date Of Delivery ] ] 2025-06-30
Czech Republic Switch Delivery 2025-06-30
Czech Republic Modernization Of The Horaždovice Suburban Line (outside) – Plzen Koterov (outside) 2025-06-30
Germany Germany – Installation Of Electrical Systems – Lv 48-2 Building Management Systems 2025-06-30
Germany Planning S -bahn Station Stuttgart - Airport/messe (upva): Air Technology Systems & Building Automation 2025-06-30
Sri Lanka Project Implementation Consultants - Power System Strengthening And Renewable Energy Integration Project 2025-06-30
Spain Supply Of Electrical Energy In Hig 2025-06-30
Whats app