Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Const.-Of-Various-Components-In-Smashan-Gruh-In-Sanand-Taluka-Like-Smashan-Bhathi,-Chhapri,-Paver-Block-Coat-&-Bakada-Work-(1)-Rupavati-(2)-Shiyavad-Ta.sanand-Dist.-Ahmedabad-Package-No.-Ahd/mp/09-(2024-2025)-(third-Time)>India -Const.-Of-Various-Components-In-Smashan-Gruh-In-Sanand-Taluka-Like-Smashan-Bhathi,-Chhapri,-Paver-Block-Coat-&-Bakada-Work-(1)-Rupavati-(2)-Shiyavad-Ta.sanand-Dist.-Ahmedabad-Package-No.-Ahd/mp/09-(2024-2025)-(third-Time)>Building
Const. Of Various Components In Smashan Gruh In Sanand Taluka Like Smashan Bhathi, Chhapri, Paver Block Coat & Bakada Work (1) Rupavati (2) Shiyavad Ta.sanand Dist. Ahmedabad Package No. Ahd/mp/09 (2024-2025) (third Time)
-Const.-Of-Various-Components-In-Smashan-Gruh-In-Sanand-Taluka-Like-Smashan-Bhathi,-Chhapri,-Paver-Block-Coat-&-Bakada-Work-(1)-Rupavati-(2)-Shiyavad-Ta.sanand-Dist.-Ahmedabad-Package-No.-Ahd/mp/09-(2024-2025)-(third-Time)>2025-08-25
-Const.-Of-Various-Components-In-Smashan-Gruh-In-Dholka-Taluka-Like-Smashan-Bhathi,-Chhapri,-Paver-Block-Coat-&-Bakada-Work-(1)-Kaliveji-(2)-Kotha-Talavadi-(3)-Rajoda-Ta.-Bavla-Dist.-Ahmedabad-Package-No.-Ahd/ap/11-(2024-2025)-(third-Time)>India -Const.-Of-Various-Components-In-Smashan-Gruh-In-Dholka-Taluka-Like-Smashan-Bhathi,-Chhapri,-Paver-Block-Coat-&-Bakada-Work-(1)-Kaliveji-(2)-Kotha-Talavadi-(3)-Rajoda-Ta.-Bavla-Dist.-Ahmedabad-Package-No.-Ahd/ap/11-(2024-2025)-(third-Time)>Building
Const. Of Various Components In Smashan Gruh In Dholka Taluka Like Smashan Bhathi, Chhapri, Paver Block Coat & Bakada Work (1) Kaliveji (2) Kotha Talavadi (3) Rajoda Ta. Bavla Dist. Ahmedabad Package No. Ahd/ap/11 (2024-2025) (third Time)
-Const.-Of-Various-Components-In-Smashan-Gruh-In-Dholka-Taluka-Like-Smashan-Bhathi,-Chhapri,-Paver-Block-Coat-&-Bakada-Work-(1)-Kaliveji-(2)-Kotha-Talavadi-(3)-Rajoda-Ta.-Bavla-Dist.-Ahmedabad-Package-No.-Ahd/ap/11-(2024-2025)-(third-Time)>2025-08-25
-Construction-Of-Dr.-Ambedkar-Hall-Bakshi-Panch-Vistar-To-Koli-Patel,-Mer-Samaj-Vadi-At-Village-Hasnnagar-Ta.-Bavla-Dist.-Ahmedabad-(2024-2025)-(third-Time)>India -Construction-Of-Dr.-Ambedkar-Hall-Bakshi-Panch-Vistar-To-Koli-Patel,-Mer-Samaj-Vadi-At-Village-Hasnnagar-Ta.-Bavla-Dist.-Ahmedabad-(2024-2025)-(third-Time)>Building
Construction Of Dr. Ambedkar Hall Bakshi Panch Vistar To Koli Patel, Mer Samaj Vadi At Village Hasnnagar Ta. Bavla Dist. Ahmedabad (2024-2025) (third Time)
-Construction-Of-Dr.-Ambedkar-Hall-Bakshi-Panch-Vistar-To-Koli-Patel,-Mer-Samaj-Vadi-At-Village-Hasnnagar-Ta.-Bavla-Dist.-Ahmedabad-(2024-2025)-(third-Time)>2025-08-25
-Sh-Construction-Of-Building-Portion-,development-Of-Site,water-Supply-And-Sanitary-Installation,-Septic-Tank,-Harvesting-Tank-Etc>India -Sh-Construction-Of-Building-Portion-,development-Of-Site,water-Supply-And-Sanitary-Installation,-Septic-Tank,-Harvesting-Tank-Etc>Development Of Multistoried Car Parking At Chamba Distt. Chamba Hp
Sh Construction Of Building Portion ,development Of Site,water Supply And Sanitary Installation, Septic Tank, Harvesting Tank Etc
-Sh-Construction-Of-Building-Portion-,development-Of-Site,water-Supply-And-Sanitary-Installation,-Septic-Tank,-Harvesting-Tank-Etc>2025-08-25
India Annual Zonal Contract For Signal & Telecom Gears For Fy 2025-26 Under The jurisdiction Of Dste/ers Section (srr(excl.)-vtk-mgk-pnq-guv-tcr-puk-ijk-cki- afk-awy-klmr-ipl-ern- Trtr-mntt(incl.)-ers- Chts-kumm-tuvr(excl.)) In Tvc division. 2025-08-25
India Annual Zonal Contract For Signal & Telecom Gears For Fy 2025-26 Under The jurisdiction Of Aste/qln Section Mntt(excl.)-pvrd-vard-krpp-etm-ktym-cgv- cgy-trvl- Cngr-mvlk-kyj-chpd- Ocr-kpy-stkt-prnd- Qln-pvu-vak-kvu(incl.). tuvr(incl.)-srtl-makm-allp-ampa-ha 2025-08-25
India Electrification Work In Connection With Provision Of One Common Room For datalogger, Eld, Fuse Alarm System Monitoring And Storing S&t Critical maintenance Spares At Various Stations/automatic Huts On Bsl Division. 2025-08-25
Bhutan Supply Of Electrical And Mechanical Items 2025-08-25
Canada Re-siding Of Haines Lake Building 2025-08-25
India Supply Of 3 1 Divided 2 Core X 240 Sq.mm Aluminium, Armoured, Lt Power Cable 2025-08-25
Whats app