Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Supply And Laying Of Ht Ug Line, Metering Unit And Provision Of 250 Kva Sub-station For Power Supply To 300 Seated Auditorium At Athamallik (nac) For The Year 2025-26. 2025-12-29
India Shifting Of 11kv Line/lt Line From Balaramprasad Chhaka To Mundasahi Chhaka Near Fci Under Chainpal Section Of Angul District For The Year 2025-26. 2025-12-29
India Universal Lock Lift Lever Connector For C.b. Coupler. .#* Universal Lock Lift Lever Connector For C.b. Coupler To Rdso Drg. No. Sk-62724, Alt.31, Item 6. [ Warranty Period: 30 Months Aft er The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item C 2025-12-29
India Purchase Of Street Light And Material For Mc Rupnagar 2025-12-29
India Repair And Maintenance Of Kasturaba Gandhi Balika Vidyalaya (kgbv) Hostel At Khamar For 2025-26 (civil, Ei, Ph) 2025-12-29
India Key Lock Checking Relay Klcr 60v Dc .#* Key Lock Checking Relay Klcr 60v Dc With 4f/4b Contact Different Ward Combination With C ase (key Lock Checking Relay With Different Ward Combinations Three Ward Plates To Be Supplied With Each relay) Working On 60v 2025-12-29
India Blower Scavange For Traction Motor And Oil Cooler With Motor .#* Blower Scavange For Traction Motor And Oil Cooler With Motor As Per Clw s Spec. No. Clw/es/3/0021 (alt.-h) For Wag9 Type Electric Locos. [ Warranty Period: 30 Month s After The Date Of Deliv 2025-12-29
India Supply Of Electrician And Helper For Maintenance Of Street Light In City 2025-12-29
India Motor For Machine Room Blower . .#* Motor For Machine Room Blower As Per Clw Specn. No. Clw/es/3/0020 Alt-h And Als o Including Rdso Specification No. Spec/e-10/3/09 (motor) With Amendments 1, 2,3, 4, 5 & 6. [ Warrant y Period: 30 Months After The Date Of 2025-12-29
India Supply Of Electrician, Fitter, Pump Operator And Keyman For Water Supply Maintenance For One Year 2025-12-29
Whats app