Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India 60nos Of Street Light At Hantal Gp Area 2025-12-17
India Construction Of Icds At Keshabpur Mollapara Jl77 2025-12-17
India Installation Of Solar Light At Haddatola Bandh Beside The House Of Amal Ghosh. Scheme Idapas/01/049/130/0003 2025-12-17
-Construction-Of-Mini-Shade-At-Jalapara-Ujjwal-Sangha-At-Booth-No-275-South-Jalapara-Under-Panchghara-Gp-Within-Chanditala2-Panchayat-Samity>India -Construction-Of-Mini-Shade-At-Jalapara-Ujjwal-Sangha-At-Booth-No-275-South-Jalapara-Under-Panchghara-Gp-Within-Chanditala2-Panchayat-Samity>25/ch-ii Ps/25-26 Sl27
Construction Of Mini Shade At Jalapara Ujjwal Sangha At Booth No 275 South Jalapara Under Panchghara Gp Within Chanditala2 Panchayat Samity
-Construction-Of-Mini-Shade-At-Jalapara-Ujjwal-Sangha-At-Booth-No-275-South-Jalapara-Under-Panchghara-Gp-Within-Chanditala2-Panchayat-Samity>2025-12-17
India Installation Of Solar Light Submersible In Front Of Satighat Shamshan Mouza Rajnagar Jl 205 2025-12-17
India Solar Drinking Water At Dhemal Nepali Primary School At Ps No103 Under Gossainpur 2025-12-17
India Installation Of Solar Light Near Hazrat Ali House At Ballitola Of Mothabari Gp Under Kaliachak-ii Dev Block 2025-12-17
-Installation-Of-Street-Light-Of-Entire-Area-At-Part-310-Booth-No-310-Under-Bally-Gp>India -Installation-Of-Street-Light-Of-Entire-Area-At-Part-310-Booth-No-310-Under-Bally-Gp>Wb/hzp/bj/bgp/nit-29/apas 25-26
Installation Of Street Light Of Entire Area At Part 310 Booth No 310 Under Bally Gp
-Installation-Of-Street-Light-Of-Entire-Area-At-Part-310-Booth-No-310-Under-Bally-Gp>2025-12-17
-Maintenance-Of-Dabaipani-Club-House-Within-Lingsey-Gp-Under-Pedong-Development-Block>India -Maintenance-Of-Dabaipani-Club-House-Within-Lingsey-Gp-Under-Pedong-Development-Block>Maintenance Of Dabaipani Club House Within Lingsey Gp
Maintenance Of Dabaipani Club House Within Lingsey Gp Under Pedong Development Block
-Maintenance-Of-Dabaipani-Club-House-Within-Lingsey-Gp-Under-Pedong-Development-Block>2025-12-17
-Annual-Maintenance-Of-Ei-Work-Int-And-Ext-Incl-Operation-Of-Pump-Motor-Sets-Within-The-Campus-Of-Saheb-Bagan-Ihe,-Liluah,-Howrah-On-All-Working-Days-Incl-Saturday,-Sunday-And-Govt.-Holidays-For-Twelve-Months.>India -Annual-Maintenance-Of-Ei-Work-Int-And-Ext-Incl-Operation-Of-Pump-Motor-Sets-Within-The-Campus-Of-Saheb-Bagan-Ihe,-Liluah,-Howrah-On-All-Working-Days-Incl-Saturday,-Sunday-And-Govt.-Holidays-For-Twelve-Months.>Wbhd/ee/ed-1/eniq-167/2025-26
Annual Maintenance Of Ei Work Int And Ext Incl Operation Of Pump Motor Sets Within The Campus Of Saheb Bagan Ihe, Liluah, Howrah On All Working Days Incl Saturday, Sunday And Govt. Holidays For Twelve Months.
-Annual-Maintenance-Of-Ei-Work-Int-And-Ext-Incl-Operation-Of-Pump-Motor-Sets-Within-The-Campus-Of-Saheb-Bagan-Ihe,-Liluah,-Howrah-On-All-Working-Days-Incl-Saturday,-Sunday-And-Govt.-Holidays-For-Twelve-Months.>2025-12-17
Whats app