Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India New Mahe Gp Annual Plan 2025 26 Proj No 209/26 Construction Of Foot Path From Kadappuram Avittam Shobhana House To Naseemas House, Annual Plan-new Mahe Gp Annual Plan 2025-26 - Proj.no - 209/26-construction Of Foot Path From Kadappuram Avittam Shobhana Ho 2025-08-23
India Ward Tarana Antargat Baipass Marg Se Bakhedu Ram Advocate Makan Se Budhiram Prajapati Ke Makan Tak Interlocking Karya ,2.0 ,construction Of Embankment Filling With Approved Material Obtained From Borrow Pits With A Lift Upto 1.5 M, Transporting To Site, S 2025-08-23
India Annual Plan Maintenance Works Of Koodathil Mukku Malancheri Road 81 20245 26 General Civil Work, Annual Plan-maintenance Works Of Koodathil Mukku Malancheri Road -81/20245-26-general Civil Work, 75.5.5.b.2pb:modified Penetration Macadam 75 Mm Thick Using 2025-08-23
India Lrrp 2024 25 Thalassery Lac Sl No 169 Alfas Kunjithayil Road New Mahe Gp Kannur District Alfas Kunjithayil Road Retarring, Lrrp-lrrp 2024-25, Thalassery Lac, Sl.no -169, Alfas - Kunjithayil Road , New Mahe Gp, Kannur District-alfas - Kunjithayil Road Reta 2025-08-23
India Lrrp_2024-25_kottarakkara Lac_factory Junction Eezhakkala Road_neduvathoor Gp, Lrrp-lrrp_2024-25_kottarakkara Lac_sl.no. 3314/2025_factory Junction Eezhakkala Road_neduvathoor Gp_kollam District-lrrp-general Civil Work-1, Road Widening And Tarring, 75.8.1 2025-08-23
India Annual Plan Maintenance Work Of Kallupuram Padinjarethazhe Road 87 2024 25 Kunnummal Gp General Civil Wor, Annual Plan-maintenance Work Of Kallupuram Padinjarethazhe Road-87/2024-25-kunnummal Gp-general Civil Work, Road, 75.5.2.3pb:tack Coat - With Packed 2025-08-23
India Annual Plan-mannancherry Gp 2025-26 -improovements Of Coir Board -beverage Road In Ward No -15-pr No -187/26-general Civil Work, Annual Plan-mannancherry Gp 2025-26 -improovements Of Coir Board -beverage Road In Ward No -15-pr No -187/26-general Civil Wor 2025-08-23
India Annual Plan-/-- Kanakkary Gp Ashupathripady-maliyepady-millumpady-kuttiyani Road Maintance Ward -general Civil Work ,2.0 ,road Retarring ,3.2:preparation Of Foundation For Embankment <br> Scarifying Existing Bituminous Surface To A Depth Of 150 Mm B 2025-08-23
-Service-Availing-For-Bhel-Make-Pro-control-And-Max-Dna-Distributed-Control-System-(dcs)-Of-Unit5-To-8>India -Service-Availing-For-Bhel-Make-Pro-control-And-Max-Dna-Distributed-Control-System-(dcs)-Of-Unit5-To-8>As Per Bid Documents
Service Availing For Bhel Make Pro-control And Max Dna Distributed Control System (dcs) Of Unit5 To 8
-Service-Availing-For-Bhel-Make-Pro-control-And-Max-Dna-Distributed-Control-System-(dcs)-Of-Unit5-To-8>2025-08-23
India Annual Plan-renovation Of The Waiting Shed At Kallooppara Junction, Annual Plan --/--general Civil Work ,2.0 ,renovation Of Waiting Shed ,14.1.1:repairs To Plaster Of Thickness 12 Mm To 20 Mm In Patches Of Area 2.5 Sq Meters And Under, Including Cutting 2025-08-23
Whats app