Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Side Lamp Fitting Complete For Brake Van. .#* Side Lamp Fitting Complete For Brake Van ( Without Lamp) To Rdso Drg.no.skel-4094.the Outside Of The Fitting Should Be Finished In Synthetic En amel Red Paint To Is 2932. [ Warranty Period: 30 Months After The 2026-01-12
India 100 Va, 750 V / 110 V, Ac, Single Phase. .#* 100 Va, 750 V / 110 V, Ac, Single Phase, Dry Type And Air Cooled Control Transformer As Per Rdso Specification No. R dso/pe/spec/ac/0203 - 2020 (rev.0), Type Iv With Rdso Drawing Rdso/pe/sk/ac/0223-2020 (rev.0) 2026-01-12
India Double Ended Jumper Plug Assembly. .#* Double Ended Jumper Plug Assembly 500 Amps (male Coupler Attached At Both End Of Jumper Cable), With 1.65 Meters Cable In Length for Rncc Cross Feeder As Per Rdso Spec No. Rdso/pe/spec/ac/0177 - 2023 (rev -0) Or Late 2026-01-12
India Repairing Of Highmust Solar Light Near The Dalsingpara Gp Office At Part No. 63 Apas Id Apas/01/011/63/0020 2026-01-12
India Repairing Of Highmust Solar Light At Nepali Durga Mandir Part No. 11/64 Road Line Sn. No. Iv Apas Id Apas/01/011/64/0006 2026-01-12
India Const. Of Toilet Near Rbc Church At South Poro Part No 11/248 Apas/01/011/248/0009 2 Construction Of Washroom At Buxa Chowpati Along With Water Supply Under Rajabhatkhawa Gram Panchayat Apas 01/011/2370004 2026-01-12
India Single Phase To Three Phase 2 X 130 Kva Convertor (siv) For Conventional locomotives...etc .#* Single Phase To Three Phase 2 X 130 Kva Convertor (siv) For Conventional Locomotives As Per rdso Specification No. Rdso/2018/el/spec/0140 Rev-1 [ Warranty Perio 2026-01-12
-Day-To-Day-Routine-Preventive-Maintenance-Of-The-Electrical-Installation,-Including-The-Substation-At-The-Administrative-Complex,-Nimtouri,-Purba-Medinipur.-(for-The-Period-Of-Three-(03)-Years.>India -Day-To-Day-Routine-Preventive-Maintenance-Of-The-Electrical-Installation,-Including-The-Substation-At-The-Administrative-Complex,-Nimtouri,-Purba-Medinipur.-(for-The-Period-Of-Three-(03)-Years.>Pwd/sse/swec/niq104/2025-26
Day To Day Routine Preventive Maintenance Of The Electrical Installation, Including The Substation At The Administrative Complex, Nimtouri, Purba Medinipur. (for The Period Of Three (03) Years.
-Day-To-Day-Routine-Preventive-Maintenance-Of-The-Electrical-Installation,-Including-The-Substation-At-The-Administrative-Complex,-Nimtouri,-Purba-Medinipur.-(for-The-Period-Of-Three-(03)-Years.>2026-01-12
India 1 Installation Of 03 Nos Of Solar Light Near The House Of 1 Barka Santhal 2 Bishnu Ganju 3 Biswajit Ghosh Under Rajabhatkhawa Part No 11/243 Apas/01/011/243/0010 2 Installation Of New Solar Light From Masanekhola River To Jokshatagu At Chunabh 2026-01-12
India 1 Installation Of Solar Light At Bhutiya Basti 4nos Part No 11/250 Apas/01/011/250/0005 2 Installation Of Solar Light At Poro Dabri 6 Nos At Saiju Rava House To Amal Rava House Part No 11/248 Apas/01/011/248/0004 3 Installation Of Solar Lig 2026-01-12
Whats app