Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Bulgaria Selection Of Supplier Of Net Active Electrical Energy - Medium Voltage And Coordinator Of Balancing Group For Objects Supplied With Electricity Used By Dp Kabiyuk In 2026 For A Period Of Twelve Months 2026-01-19
France The Purpose Of This Consultation Is The Scheduling, Steering And Coordination (opc) Missions Of The Execution Phases Of The Work To Reduce Final Energy Consumption Within The Framework Of The 2030 Objective Of Decree No. 2019-771 Of July 23, 2019 ( tertia 2026-01-19
Germany Electrical Work School Felix-klein-straße 2026-01-19
Germany Shell Ii Nea, Transformer, Garbage 2026-01-19
India Main Air Compressor, Oil Free Along With Modular Mounting Frame Assembled With 3 phase Induction Motor, Cooler Unit & Air Drier Etc .#* Main Air Compressor, Oil Free Along With Modular Mounting Frame Assembled With 3 Phase In duction Motor, Cooler Unit & 2026-01-19
India Anti-vibration Mounting (avm) For 60 Kva Transformer For Lhb Ac Coaches equivalent To Resistoflex Part No.efm 2.65 With M-12 Tapped Hole As Per Rdso specification No: Rdso/pe/spec/ac/0080- 2007(rev- 2) Or Latest. Acceptable makes As Specified In The Above 2026-01-19
India Air Blast Transformer Oil Cooler (radiator) With Blower Motor For Bhel Emus To icf Spec. No.icf/elec/014 Rev. A & Drg. No. Icf/sk-9-0-606 Alt E Or Latest. .#* Air Blast Transformer Oil Cooler (radiator) With Blower Motor For Bhel Emus To Icf Spec. no.icf/ 2026-01-19
Germany Strain 2026-01-19
Finland Building Automation Works, Framework Agreement For The Years 2026-2027 (option 2028-2029) 2026-01-19
Romania Design And Execution Of Photovoltaic Panel System Works, Including Temporary Panel And Permanent Panel Related To The Project Realization Of New Capacities To Produce Electricity From Solar Resources Through Photovoltaic Panels At The Headquarters In Timi 2026-01-19
Whats app