Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Trivandrum Division-upgradation Of Overaged Earthing Systems At Tsss, Sps And ssps And Various Stations 2026-01-14
India Bengaluru - Salem Section : Sw I : Construction Of Staff Quarters On Replacement basis Of Type-ii Quarters 4 Units And Type-iii Quarters 01 Unit In Lieu Of 4/a, B, C And 16/a, B At Rayakkottai (ryc) Station Under Aden/dharmapuri Sub-division, including El 2026-01-14
India Construction Of Staff Quarters ( Type-ii 128 Units, Type-iii 50 Units Type -iv 18 unit),pump House,oht, Deep Tubewell With Irp,drain ,road Other Ancilliary Works with All Necessary Electrification Works In Connection With Lumding-furkating doubling Projec 2026-01-14
-Construction-Of-Mechanized-Godowns-With-The-Capacity-Of-12000-Mt-On-Design,-Build,-Finance,-Operate-And-Trans>India -Construction-Of-Mechanized-Godowns-With-The-Capacity-Of-12000-Mt-On-Design,-Build,-Finance,-Operate-And-Trans>Construction Of Mechanized Godowns With The Capacity Of 12000 Mt On Design, Build, Finance, Operate And Transfer (dbfot) Model,at Fsd Avadi
Construction Of Mechanized Godowns With The Capacity Of 12000 Mt On Design, Build, Finance, Operate And Trans
-Construction-Of-Mechanized-Godowns-With-The-Capacity-Of-12000-Mt-On-Design,-Build,-Finance,-Operate-And-Trans>2026-01-14
India Estimate For Replacement Of 01 No. 33kv 11 Mtr Pcc Pole Of 33kv Ajgarbahar Feeder At Gopalpahari Mod Of Darri R Dc Of Katghora Sub Dn. Under O&m Dn. Katghora 2026-01-14
India Estimate For 1 No. 33kv Tp And 1 No. 11kv Pcc Pole For 33kv Chhuri Line & At Sutarra By Pass Of Pali Sub Dn Under O&m Dn.katghora 2026-01-14
India Provision Of 500 Kva Transformer With Accessories For Simulator Complex At Arty Centre Hyderabadunder Ge Golconda 2026-01-14
-Installation-And-Improvement-Of-Lighting-System-At-Balaram-Bose-2nd-Lane-In-Ward-No.-70-Under-Br.-viii.>India -Installation-And-Improvement-Of-Lighting-System-At-Balaram-Bose-2nd-Lane-In-Ward-No.-70-Under-Br.-viii.>Kmc/ltg/b-8/apas/70/25-26/199
Installation And Improvement Of Lighting System At Balaram Bose 2nd Lane In Ward No.-70 Under Br.-viii.
-Installation-And-Improvement-Of-Lighting-System-At-Balaram-Bose-2nd-Lane-In-Ward-No.-70-Under-Br.-viii.>2026-01-14
-Installation-Of-Mini-Mast-With-Led-Fittings-Old-Lokenath-Mandir,-United-Friend-Club-And-Other-Areas-In-Ward-130-Under-Br-xiv,kmc..>India -Installation-Of-Mini-Mast-With-Led-Fittings-Old-Lokenath-Mandir,-United-Friend-Club-And-Other-Areas-In-Ward-130-Under-Br-xiv,kmc..>Ltg/xiv/130/25-26/p171
Installation Of Mini Mast With Led Fittings Old Lokenath Mandir, United Friend Club And Other Areas In Ward 130 Under Br-xiv,kmc..
-Installation-Of-Mini-Mast-With-Led-Fittings-Old-Lokenath-Mandir,-United-Friend-Club-And-Other-Areas-In-Ward-130-Under-Br-xiv,kmc..>2026-01-14
-Construction-Of-Building-Less-Primary-Health-Centre-Phc-At-Nandaigajan-Phc-Kolaghat-Purba-Medinipur-Under-Xv-Fc-Hg-During-The-Year-2023-2024>India -Construction-Of-Building-Less-Primary-Health-Centre-Phc-At-Nandaigajan-Phc-Kolaghat-Purba-Medinipur-Under-Xv-Fc-Hg-During-The-Year-2023-2024>Wbpwd/ss/se/swc/nit_15/1_25_26
Construction Of Building Less Primary Health Centre Phc At Nandaigajan Phc Kolaghat Purba Medinipur Under Xv Fc Hg During The Year 2023 2024
-Construction-Of-Building-Less-Primary-Health-Centre-Phc-At-Nandaigajan-Phc-Kolaghat-Purba-Medinipur-Under-Xv-Fc-Hg-During-The-Year-2023-2024>2026-01-14
Whats app