Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Rate Contract For Flood Restoration Work On Cd Work Block Todaraisingh In Division Malpura ,2.0 ,providing Laying Spreading And Compacting Specified Graded Sand, Gravel (crushed Stone) As Per Table 400-1,400-2 Or Any Other Course Material As Per Design Mi 2025-08-23
India Providing Of Various Items/facilities To Ao Office & Technical Section (circle Office) At Direction Office Building Of M&hed Kashmir, 2.0, Repairs To Office Table By Way Repacement Of Damaged Mica With New Mica Of Approved Shade/colour 0.8 Mm Thick Of Si 2025-08-23
India Annual Plan--of Chazhur Gp. Renovation Of Irattappalam Canal Bund Road In Ward No.-project No./--general Civil Work ,2.0 ,road Maintenance ,3.2:preparation Of Foundation For Embankment Scarifying Existing Bituminous Surface To A Depth Of 150 Mm By Mechan 2025-08-23
India Annual Plan--of Chazhur Gp. Renovation Of St.anns Road South In Ward No.-project No./--general Civil Work ,2.0 ,retarring ,3.2:preparation Of Foundation For Embankment <br> Scarifying Existing Bituminous Surface To A Depth Of 150 Mm By Mechanical Me 2025-08-23
India Annual Plan--of Chazhur Gp. Renovation Of Kottam Road In Ward No.-project No./--general Civil Work ,2.0 ,retarring ,3.2:preparation Of Foundation For Embankment Scarifying Existing Bituminous Surface To A Depth Of 150 Mm By Mechanical Means Scarifying T 2025-08-23
India Annual Plan--of Chazhur . Renovation Of Swargaveedhi Jayanthi Link Road In Ward No.-project No./--general Civil Work ,2.0 ,renovation Of Road ,3.2:preparation Of Foundation For Embankment <br> Scarifying Existing Bituminous Surface To A Depth Of 15 2025-08-23
India Annual Plan--of Chazhur Gp. Renovation Of Inchamudy Ring Road In Ward No.-project No./--general Civil Work ,2.0 ,retarring ,3.2:preparation Of Foundation For Embankment <br> Scarifying Existing Bituminous Surface To A Depth Of 150 Mm By Mechanical 2025-08-23
India General-naduvil Grama Panchayat-kuttyppule Tourisem Childrens Park Pro No.s0171/-electrification-project No-/-general Electrical Work ,2.0 ,electrification ,1.10.3:wiring For Light Point/ Fan Point/ Exhaust Fan Point/ Call Bell Point With 1.5 Sq.mm Frls P 2025-08-23
India Annual Plan--of Chazhur Gp.renovation Of Mukkilakkad Road In Ward No.-project No./-general Civil Work ,2.0 ,retarring ,3.2:preparation Of Foundation For Embankment Scarifying Existing Bituminous Surface To A Depth Of 150 Mm By Mechanical Means Scarifyin 2025-08-23
India General-maintenance Of Street Lights And Mini High Mast Mariyapuram-estimate For The Maintenance Of Street Lights And Mini High Mast Lights At Various Wards Of To Wards Under Mariyapuram Gp-general Electrical Work ,2.0 ,part - I : Maintenance Of 144 Nos 2025-08-23
Whats app