Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Supply Of Starter Lead Acid Battery Capacity 8v, 290 Ah Low Maintenance For Power Cars Confirming To Rdso Specification No. Elps/spec/tl/ 0001 -98 (rev-0) With Amendment No.1 Or Latest. Complete With Inter Cell Connector And Fasteners. Initial Charging Of 2026-01-16
India Supply Of Thin Walled Electron Beam Irradiated/chemically Cured Crosslinked Flexible Elastomeric Cable With Copper Conductorsingle Core, Size: 240 Sq Mm, 3000v To Rdso Specification No. Elrs/spec/elc/0019. Rev 4 Of February 2018.the Requirement Of Working 2026-01-16
India Supply Of Set Of Switch Plate Assembly For Lhb Eog Non Ac Lscn Coaches With Bus Type Windows To Icf Specification No. Icf/edml-012.rev-b. And Drawing No: Icf / Sk3-7-4-013 Alt C Or Latest, Item No:1, Firm Shall Submit Prototype Sample Approval Copy Of Icf 2026-01-16
India Supply Of Cordless/brushless Rivet Gun With Compatible Rivet Diameter: 2.4mm, 3.2mm, 4.0mm, And 4.8mm. Spec: 1) Max Pulling Forces: 10 Kn 2)length Of Stroke: 25mm 3) Battery 18 V Lithium-ion 3.0 Ah Withrapid Charger (full Battery Charging Time: 25 Min) Ma 2026-01-16
-3.emergency-Repairing-Of-The-Centrifugal-Pump-And-Panel-Board-(damaged-Due-To-High-Voltage)-At-Dubrajpur-Pahareswar-Pump-House-Under-Water-Supply-Scheme-Of-Dubrajpur-Municipality,-Uidssmt>India -3.emergency-Repairing-Of-The-Centrifugal-Pump-And-Panel-Board-(damaged-Due-To-High-Voltage)-At-Dubrajpur-Pahareswar-Pump-House-Under-Water-Supply-Scheme-Of-Dubrajpur-Municipality,-Uidssmt>3.emergency Repairing Of The Centrifugal Pump And Panel Board
3.emergency Repairing Of The Centrifugal Pump And Panel Board (damaged Due To High Voltage) At Dubrajpur Pahareswar Pump House Under Water Supply Scheme Of Dubrajpur Municipality, Uidssmt
-3.emergency-Repairing-Of-The-Centrifugal-Pump-And-Panel-Board-(damaged-Due-To-High-Voltage)-At-Dubrajpur-Pahareswar-Pump-House-Under-Water-Supply-Scheme-Of-Dubrajpur-Municipality,-Uidssmt>2026-01-16
Switzerland Delivery Ms Cable 2026-01-16
Macedonia Electricity Continuously For A Period Of 12 Months For The Needs Of Boris Trajkovski Dooel Skopje For The Year 2026/2027 2026-01-16
Poland Replacement Of Hot Water, Central Heating And Sewage Installations In The Buildings Of The University Clinical Hospital In Wroclaw At Ul. Borowska 2026-01-16
Netherlands Digital Boards 2026-01-16
Macedonia Specialized Supervision By The Manufacturer Of The Equipment During Overhaul And Interventions Of Turbine And Generator Rek Bitola 2026-01-16
Whats app