Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Poland The Task Of Constructing The Connection To The Grid Of The Baltica 1 Offshore Wind Farm, Including The Development Of Feed Documentation, Technical Purchase Documentation And, As An Option, The Development Of Construction Designs Together With Obtaining F 2025-11-19
Poland Delivery Of A Set Of Two Generators With A Minimum Power Of 300 Kw Each, Placed In One Housing. 2025-11-19
Poland Purchase Of Electricity For The Period From January 1, 2026 To December 31, 2026 For Members Of The Energy Cluster In Gliwice, Including The Sale Of Electricity From Renewable Energy Sources And Commercial Balancing Services 2025-11-19
Poland Reconstruction Of The Single-circuit 110 Kv Overhead Line Between Groszowice (opole City) And Ozimek 2025-11-19
Poland renewable Energy Sources In The Belchatów Commune – 3rd Edition 2025-11-19
Poland Renewable Energy Sources In The Brudzew Commune - Supply Of Equipment And Installation Of Photovoltaic Installations And Energy Storage Facilities 2025-11-19
Poland Provision Of Contract Engineer Services For The Project "removal Of Collisions Between 110 And 220 Kv High-voltage Lines During The Construction Of The Central Communication Port. 2025-11-19
Poland Supply Of Electricity In The Period From 01/01/2026 To 31/12/2027 2025-11-19
Poland Reconstruction Of The 110 Kv Piotrkow Kujawski - Karczyn Line. Design And Build Project 2025-11-19
Poland Dychow Hydroelectric Power Plant - Turbine Regulators 1, 2, 3 2025-11-19
Whats app