Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Netherlands Replace Led Lighting And Emergency Lighting 2025-10-14
Switzerland Installation Of Photovoltaic Systems 2025-10-14
Germany Tibujewstrasse 43-47- Lot 10 Heating 2025-10-14
India Ceramic Resistor For Wood Ward Governor Etc. .#* Ceramic Resistor For Wood Ward Governor To Woodward Part No 5433665, dlw Pt.no.16340073. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal 2025-10-14
India Procurement Of Brush Holder Assly Ta 17 Wdg4 Etc. .#* Brush Holder Assembly Generator- Ta17 To Emd Part.no.9577092 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variat 2025-10-14
India Rectifier Cum Regulator Unit Suitable For 4.5 Kw, 110/120 V Dc Brush Less alternator, Conforming To Rdso Specification No. Rdso/pe/spec/tl/0054-2003 (rev.-0) With Amendment No.-1& 2. .#* Rectifier Cum Regulator Unit Suitable For 4.5 Kw, 110/120 V Dc Brush 2025-10-14
India Toggle Switch 10 Amp, 250 Volt Double Polle Single Throw Drawing no.ndl/ef-1910 Alt- 1 .#* Toggle Switch 10 Amp, 250 Volt Double Polle Single Throw Drawing No.ndl/ef-19 10 Alt- 1 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Toleranc 2025-10-14
Malta Spd7/2025/031 Tender In Lots For The Provision Of Director And Officers And Crime And Professional Indemnity Insurance For The Malta Business Registry (mbr) 2025-10-14
Germany Tibujewstrasse 43-47- Lot 10 Heating 2025-10-14
Germany Electrical Systems 2025-10-14
Whats app