Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Instalation Of High Mast Lights Balarampur F P School And Balarampur Baro Pukur Near By Gayen Para 2nos Apas01140510004 2026-01-06
Mauritania Additive No. 03. Construction Of A 225/33 Kv Substation East Of Nouakchott (east Substation) 2026-01-06
Mauritania Additive No. 03. Construction Of A 225/33 Kv Substation East Of Nouakchott (poste-est) 2026-01-06
Germany Clearing Of Low-stem Orchards 2026-01-06
-Repair-Of-Turbine-Runner-Assembly,-Turbine-Shaft-And-Replacement-Of-Runner-Blade>India -Repair-Of-Turbine-Runner-Assembly,-Turbine-Shaft-And-Replacement-Of-Runner-Blade>675/p-3/empw-13121 Dt. 17.10.2025 For Repair Of Turbine Runner Assembly, Turbine Shaft And Replacement Of Runner Blade Of Turbine Of Unit-2 Micro Hydel Plant At Ggsstp
Repair Of Turbine Runner Assembly, Turbine Shaft And Replacement Of Runner Blade
-Repair-Of-Turbine-Runner-Assembly,-Turbine-Shaft-And-Replacement-Of-Runner-Blade>2026-01-06
India Ohe Modification Work In Connection With Rob/rub/lus In Lieu Of Level Crossing no. 6,7,137 And 141 In Salem Division Of Southern Railway 2026-01-06
India Installation Of Led Street Lights Srirampur 47no Booth 60nos Apas01140470005 2026-01-06
India Instalation Of Led Street Lights At 45no Booth 32nos Apas01140450006 2026-01-06
India Construction Of New Sc-ssk Building At Dahar Buichha Sc Under Betna Gobindapur Gpunder Hanskhali Panchayet Samity 2026-01-06
India Construction Of New Sc-ssk Building At Ghoshnagar Sc Under Mayurhat-1 Gpunder Hanskhali Panchayet Samity 2026-01-06
Whats app