Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Bulgaria Delivery Of Electrical Energy And Selection Of A Coordinator Of The Balancing Group For Facilities Of Eso Ead 2026-01-06
-Replacement-Of-Damage-Weasel-Conductor-And-Pole-At-11-Kv-Shaktifarm-Feeder-1-Under-Jailcamp-Section-Of-Edd-Upcl-Sitarganj-(o-And-M-Head).>India -Replacement-Of-Damage-Weasel-Conductor-And-Pole-At-11-Kv-Shaktifarm-Feeder-1-Under-Jailcamp-Section-Of-Edd-Upcl-Sitarganj-(o-And-M-Head).>15/2025-26/edd(s)
Replacement Of Damage Weasel Conductor And Pole At 11 Kv Shaktifarm Feeder-1 Under Jailcamp Section Of Edd Upcl Sitarganj (o And M Head).
-Replacement-Of-Damage-Weasel-Conductor-And-Pole-At-11-Kv-Shaktifarm-Feeder-1-Under-Jailcamp-Section-Of-Edd-Upcl-Sitarganj-(o-And-M-Head).>2026-01-06
-Replacement-Of-Existing-Damage-Pvc-Cable-By-Armored-Cable-Under-Shaktifarma-Area-Of-33/11-Kv-Sub-Station-Jailcmap-Under-Edd-Upcl-Sitarganj-(capital-S.i.-Head).>India -Replacement-Of-Existing-Damage-Pvc-Cable-By-Armored-Cable-Under-Shaktifarma-Area-Of-33/11-Kv-Sub-Station-Jailcmap-Under-Edd-Upcl-Sitarganj-(capital-S.i.-Head).>22/2025-26/edd(s)
Replacement Of Existing Damage Pvc Cable By Armored Cable Under Shaktifarma Area Of 33/11 Kv Sub Station Jailcmap Under Edd Upcl Sitarganj (capital S.i. Head).
-Replacement-Of-Existing-Damage-Pvc-Cable-By-Armored-Cable-Under-Shaktifarma-Area-Of-33/11-Kv-Sub-Station-Jailcmap-Under-Edd-Upcl-Sitarganj-(capital-S.i.-Head).>2026-01-06
-Construction-Of-Lt/ht-Line-For-Releasing-Of-New-Connection-Under-Jailcamp-And-Chorgaliya-Section-Of-Edd-Upcl-Sitarganj>India -Construction-Of-Lt/ht-Line-For-Releasing-Of-New-Connection-Under-Jailcamp-And-Chorgaliya-Section-Of-Edd-Upcl-Sitarganj>17/2025-26/edd(s)
Construction Of Lt/ht Line For Releasing Of New Connection Under Jailcamp And Chorgaliya Section Of Edd Upcl Sitarganj
-Construction-Of-Lt/ht-Line-For-Releasing-Of-New-Connection-Under-Jailcamp-And-Chorgaliya-Section-Of-Edd-Upcl-Sitarganj>2026-01-06
India Municipal Board Office Building At Chaksu 2026-01-06
Bosnia and Herzegovina The Procurement Procedure Is For The Purchase Of Goods, Specifically For The Supply Of Overhead Electrical Lines As Part Of The Framework Agreement. The Contract Is Not Divided Into Lots Due To The Nature Of The Procurement. Overhead Electrical Lines 2026-01-06
India Construction Of 3 Nos Of Gang Tool Cum Rest Room Under The Jurisdiction Of den(south)/sbp Of Sambalpur Division. 2026-01-06
India Electrical Works In Connection With Diversion Of Roads For Closing Of Lc Gates No. Nn- 199, Nn-201 & Nn-205. 2026-01-06
India At Dbws -stripping Of 25kw Alternator Along With Its Axle Pulley And Belt tensioning Device, Overhauling Of 25kw Alternators And Belt Tensioning Device For A period Of Two Years 2026-01-06
India Heavy Duty Cable Reel Drum With Cable An [heavy Duty Cable Reel Drum With Cable And Safety Features for Locomotive Portable Equipment Supply Extension Purpose. Drum: Round Shaped Floor Mounted heavy-duty Powder Coated Spray Painted. Suitable Wire Reel Dru 2026-01-06
Whats app