Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Installation Of 05 Nos Of Solar Street Light From Upper Bazar To Lakpa Sherpa House, Dist.- 600 Mtrs Approx (rimbick Gp). Apas/01/023/6/0001 2026-01-07
India Berth Reading Light Fitting .#* Berth Reading Light Fitting With Usb Charging Socket Suitable For Lhb Economy ac Coaches As Per Spec No. Rdso/pe/ Spec/tl/0091-2016 (rev1) & Usb Mobile Charging Sockets A s Per Edts 411, And As Per Rcf Drawing No. Lw76410, 2026-01-07
India Modem Compatible, Mother Board Compatible, Dc-dc Converter, Output Card compatible,control And Communication Card And Cpu Card Compatible. .#* Mother Board Compatible For Existing Deltron Make Ufsbi(universal Fail Safe Block Instrum ent) System Fitted In 2026-01-07
India Cable Box To Icf .#* Cable Box To Icf Drawing No. Wfc2-7-1-202, Alt K And Box Complete (for Battery Fuse A nd Eft) To Icf Drawing No. Gs-7-1-022, Alt. H. Battery Fuse Arrangement To Be Done As Per Icf Drawin g No. Wfc2-7-1-207, Alt. F Fitted With Double F 2026-01-07
India Repairing Of High Mast Light 3 Nos At Satmasa Under Arandi 1 Gp 2026-01-07
India Installation Of High Mast Light At Ghosh Pukur Par Under Arandi 2gp 2026-01-07
India Bl Type Driver Control Switch Etc . .#* Bl Type Drivers Control Switch Box As Per Drg. No. Icf/sk-7-2-270 Col-1, Alt.-p . [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value 2026-01-07
India Installation Of Solar High Mast Light At Arakul Bridge Under Arandi 1 Gp 2026-01-07
India Construction Of Protection Wall And Drainage Below Multilevel Car Park At 9th Mile. 2026-01-07
India Procurement Of Digital Bench Top Conductivity Meter At Bktpp. 2026-01-07
Whats app