Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Electrical-Works>India -Electrical-Works>Installation Of High Mast With Led Lights Near Kalibari, Bhiringhi, Durgapur, Dist.- Paschim Bardhaman.
Electrical Works
-Electrical-Works>2026-01-09
India Power Supply On/off Switch .#* Power Supply On/off Switch (s01) 02 Position With Holder For Contact Block Maintained Contact With 03 Number Of No Contact s Suitable For Sbc Panel In Lhb Coaches As Per Rdso Spec No- Rdso/pe/spec/ac/0104/-2015 Rev-1 Or Late 2026-01-09
India Screened Pvc Cable 20 Pair 0.60 Mm Copper Conductor Dia As Per Tec Specn. no.gr/wir-06/03 March-2002 (standard Number :tec 68080:2002). .#* Screened Pvc Cable 20 Pair 0.60 Mm Copper Conductor Dia As Per Tec Specn. No.gr/w ir-06/03 March-2002 (standard Num 2026-01-09
India Thermoshrink Jointing Kit For Jointing Underground Quad Cable (0.9mm Conductor dia) As Per Rdso Specification No. Irs: Tc 77-2012 Rev. 3 With Amendment 1,2 and 3 Or Latest. .#* Thermoshrink Jointing Kit For Jointing Underground Quad Cable (0.9mm Conductor 2026-01-09
India Micro Controller Based Electronic Speed Indicating, Recording System (110vdc) Type mrt 918 (paperless Type) Confirming To Rdso Specification No. mp.0.3700.07(rev.07) August 2017. Each Set Consisting Of Following Items (1) Recorder Cum Indicator Unit-01 No 2026-01-09
India Amader Para Amader Samadhan Schemes Of Booth No- 230- Ghoranash Uchchavidyalay Under Katwa-ii Dev Block 2026-01-09
India Amader Para Amader Samadhan Schemes Of Booth No-227 - Ghoranash F.p. School Under Katwa-ii Dev Block 2026-01-09
-Kmda/civil/e-And-Am/planning-Circle/se/20-Of-2025-26-(-Sl-2)>India -Kmda/civil/e-And-Am/planning-Circle/se/20-Of-2025-26-(-Sl-2)>Construction Of Proposed Urban Health And Wellness Centre (u-hnwc) At B.k.pal, Ward No. 6 Within South Dum Dum Municipality (3nd Call).
Kmda/civil/e And Am/planning Circle/se/20 Of 2025-26 ( Sl-2)
-Kmda/civil/e-And-Am/planning-Circle/se/20-Of-2025-26-(-Sl-2)>2026-01-09
-Overhauling-And-Repair-Of-120-Bhp-Diesel-Engine,-120-Hp-Electric-Motor,-15-Hp-Electric-Motor,-Main-Pump-And-Jockey-Pump-At-Fire-Pump-Room-In-The-Rg-Kar-Medical-College-And-Hospital>India -Overhauling-And-Repair-Of-120-Bhp-Diesel-Engine,-120-Hp-Electric-Motor,-15-Hp-Electric-Motor,-Main-Pump-And-Jockey-Pump-At-Fire-Pump-Room-In-The-Rg-Kar-Medical-College-And-Hospital>Wbpwd/ee/knhd/niq-11e/25-26
Overhauling And Repair Of 120 Bhp Diesel Engine, 120 Hp Electric Motor, 15 Hp Electric Motor, Main Pump And Jockey Pump At Fire Pump Room In The Rg Kar Medical College And Hospital
-Overhauling-And-Repair-Of-120-Bhp-Diesel-Engine,-120-Hp-Electric-Motor,-15-Hp-Electric-Motor,-Main-Pump-And-Jockey-Pump-At-Fire-Pump-Room-In-The-Rg-Kar-Medical-College-And-Hospital>2026-01-09
India Installation Of Solar Submersible Pump With Water Tank At Pirijpur Kalitala Under Harinkhola-ii Gp 2026-01-09
Whats app