Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Germany Delivery Of Electrical Energy (green Electricity) To All Delivery Points Of The Respective Participant. The Actual Consumption During The Delivery Period May Vary Based On Usage From The Determined Consumption Based On The Consumption Data In The Referenc 2025-09-23
Germany Delivery Of Electrical Energy (green Electricity) To All Delivery Points Of The Respective Participant. The Actual Consumption During The Delivery Period May Vary Based On Usage From The Determined Consumption Based On The Consumption Data In The Referenc 2025-09-23
Poland Testing The Theoretical Validity And Internal Consistency Of A Tool For Diagnosing Metacognitive Aspects Of Transferable Skills 2025-09-23
United States Ground Mount Pv Array System At Mine Kill State Park 2025-09-23
Spain Projects And Directions Of The Work (do) Of The Restructuring Works Of The Plant 13 And 14 Of The Hospital Of The Woman Of The University Hospital Foundation Vall D’hebron – Research Institute (vhir) 2025-09-23
Norway Bme Eøs 2025-04 Bystrand/lungegårdsparken - Turnkey Contract With Interaction - Stage 1 Qualification 2025-09-23
Poland Preparation Of Design And Cost Estimate Documentation And Construction Works Entitled: construction Of A Photovoltaic Installation With A Capacity Of 500.00 Kwp In Lubliniec. 2025-09-23
United States 98-20250822092349 Mcbs 2025-09-23
Palestine Supply And Installation Of Prepaid Electricity Meters 2025-09-23
India Tender Invited For 22960500220 , 22960500770 , Dummy 1 , Dummy 2 , Dummy 3##quantity: 5## 2025-09-23
Whats app