Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Czech Republic The Subject And Description Of The Va: the Subject Of The Contract Is The Realization Of A Work Located In The City Of Pardubice, A Local Part Of Polabina. This Is The Reconstruction Of The Hot Pipe, Communication Cables And Protectors In The Premises Of 2026-01-06
Germany 1235013-421 Preparation And Creation Of Meter Positions On Various Systems In The Lippeverband Area 2026-01-06
Switzerland Ara Briglina - Realization Of Bkp 332 Electrical Installations 2026-01-06
India Setting Up An Intrastate Transmission System For The Air-insulated Substation 2026-01-06
India 4 Inch Duplex Pressure Gauge (flush Mounted) .#* 4 Inch Duplex Pressure Gauge (flush Mounted) Ar-pr As Per Rdso Drg No. Skdp 3509 A lt. 3 With 110v Operating Voltage Led Arrangement As Per Rdso Drg No Skdp-3518 Alt-2. [ Warranty period: 30 Months After Th 2026-01-06
India Sub Kit Aoh-2a For Tap Changer N-32 .#* Sub Kit Aoh-2a For Tap Changer N-32 As Per Annexure-q2 Of Rdso Tc No. Rdso/20 10/el/tc/0102 Rev. 1 & Amendment No.1, One Kit Consisting Of 7+2( Hardware Items As Per Annexure aoh-hw-2) [ Warranty Period: 30 Months A 2026-01-06
India Spring Loaded Switch .#* Spring Loaded Switch For 6a-250v Used As Zpt, Bldj, Blho (pos No. 129,134,169.1) Ty pe-sbm- F/tou/21/22/r20 As Per Clw Spec. No. Clw/es/3/ 0075 Alt B & Abb Document No. Hbtb5856 04 R 3001. [ Warranty Period: 30 Months After The Da 2026-01-06
France Amo Expert In Hydroelectricity For Development And Permitting Missions, Pre-construction And Construction Of The Bras Des Lianes Hydroelectric Power Station 2026-01-06
Japan Electricity To Be Used In Ochanomizu University 1 Set 2026-01-06
Japan Gas To Be Used In Riken Tsukuba Campus 1 Set 2026-01-06
Whats app