Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Switzerland Swissgrid Plans To Replace The Existing Overhead Line From Löbbia To Tinzen In The Section From Marmorera (mast No. 1351x055) To The Tinzen Substation. Engineering Services In The Field Of Overhead Line Planning Are Required To Develop The Construction Pr 2025-08-20
-Construction-Of-Overhead-Ta>India -Construction-Of-Overhead-Ta>Construction Of Overhead Tanks, Water Distribution Network And Metering For Safe Drinking Water With House To House Connections Covering 36 Mouzas In Nandigram-i And Ii Blocks Of Purba Medinipur- Wbdwsip/dww/em/03/2025-26
Construction Of Overhead Ta
-Construction-Of-Overhead-Ta>2025-08-20
Nepal Ifb No. Ndcl/cto/icb/16/081-82 For Supply, Delivery, Installation And Commissioning Of Solar Power System At New Sites And Sites With Upgradation Requirements. 2025-08-20
Japan Storage Battery, Generator Set , Generator Set, Uninterruptible Power Supply 2025-08-20
India Contact Tip For Fs Contactor Dlw Drg No El/pt. .#* Contact Tip For Fs Contactor Dlw Drg No El/pt.0614 Alt R4 Or Latest. Pt. No. 12140491. I tem No. 018.rdso Specn No. Mp.0.04.00.08.rev.01. May 2010. [ Warranty Period: 30 Months After T he Date Of Delivery 2025-08-20
India Traction Converter Digital Input Cum Output Acu Control Card .#* Acu Control Card(cc) As Per Medha Code No. Sp676201046 [ Warranty Period: 30 M onths After The Date Of Delivery ] ] 2025-08-20
Serbia Mobile Aqm Lab, With Trail, Consumable Materials And Sensor Devices With Solar Panels 2025-08-20
Spain Dynamic Acquisition System 1-2025 2025-08-21
Germany Sapropterin (ple)_tk, Hek, Hkk 2025-08-21
Moldova Republic of Works Of The Third Floor In The Public Institution "a. Pushkin" Gymnasium In Cimi?lia 2025-08-21
Whats app