Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Electronic Timer For Star Delta Starter .#* Electronic Timer For Star Delta Starter,03 Sec To 60 Sec, Control Voltage 380-440v/200-2 40v, 50/60 Hz Confirming To Iec-60947,61812-1, As Per Siemens Make Cat No 3rp15761nm208k, And schneider Make Cat No.re22r1 2025-09-16
India 1) Nasik Station - Trackwork In Connection With Yard Remodelling For Provision Of emergency Cross Over At Mumbai End To Facilitate Reception Of Dn Train On Up Pf- 4.(01.01.16.25.3.50.006) (track Work) 2) Kherwadi- Trackwork In Connection With yard Remodel 2025-09-16
India 10 Pair Pijf Cable 0.63mm Dia Copper .#* 10 Pair Pijf Cable 0.63mm Dia Copper Conductor( Armoured Pijf Cable) [ Warranty Period: 0 Months After The Date Of Delivery ] ] 2025-09-16
India 50 Pair Pijf Cable .#* 50 Pair Pijf Cable: - Solid Polythene Insulated Fully Filled, Polythene Sheathed 50 Pairs Pijf U nderground Telecom Cable With Armored Having 0.63mm Dia. Of Each Conductor As Per Tec Gr No. Gr/cu g-01/03 Aug 2003 (tec Standard: Tec 2025-09-16
India Prosense Relay Card . .#* Prosense Relay Card To Jk Exim Part No. Jk-fsd-1125 Or Similar [ Warranty Period: 30 Mont hs After The Date Of Delivery ] ] 2025-09-16
-Renovation-Of-Electrical-Wiring-At-Security-Barrack-And-Fire-Fighter-Building-In-Scope-Of-Em-Oph-Dept-Btps-Under-Cap-Ex>India -Renovation-Of-Electrical-Wiring-At-Security-Barrack-And-Fire-Fighter-Building-In-Scope-Of-Em-Oph-Dept-Btps-Under-Cap-Ex>Renovation Of Electrical Wiring At Security Barrack And Fire Fighter Building In Scope Of Emoph Dept Btps Under Cap Ex 2025 2026
Renovation Of Electrical Wiring At Security Barrack And Fire Fighter Building In Scope Of Em Oph Dept Btps Under Cap Ex
-Renovation-Of-Electrical-Wiring-At-Security-Barrack-And-Fire-Fighter-Building-In-Scope-Of-Em-Oph-Dept-Btps-Under-Cap-Ex>2025-09-16
-Re-alignment-Of-Tower-No.-Kp193-To-Kp198-In-Respect-Of-220kv-D/c-Kishenpur-pampore-Transmission-Line.>India -Re-alignment-Of-Tower-No.-Kp193-To-Kp198-In-Respect-Of-220kv-D/c-Kishenpur-pampore-Transmission-Line.>Re-alignment Of Tower No. Kp193 To Kp198 In Respect Of 220kv D/c Kishenpur-pampore Transmission Line
Re-alignment Of Tower No. Kp193 To Kp198 In Respect Of 220kv D/c Kishenpur-pampore Transmission Line.
-Re-alignment-Of-Tower-No.-Kp193-To-Kp198-In-Respect-Of-220kv-D/c-Kishenpur-pampore-Transmission-Line.>2025-09-16
India Repairs / Maint Of Lt Cable, Lt Panels, Mccb, Feeder Pillar And Other Connected Works Of Eastern Area At Hisar Mil Stn Under Ge Hisar. 2025-09-16
India Spl Repair / Replacement Of Lt Panel And Connected Items In Dstv Jcos / Ors Md Accn At Hisar Mil Stn Under Ge Hisar 2025-09-16
India Creation Of 100 Kva Substn At Anwar Gujjar Colony 100 Kva Substn At Ashacolony Golegujral Including Laying Of Required 11 Kv And Lt Network For Dispersal Of Power Falling Under The Jurisdiction Of Sd Canal On Turnkey Basis Schemecode Pddss2526100451 2025-09-16
Whats app