Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Construction Of Bihar Scheduled Tribe Research And Training Institute For The Year 2025-26 . 2025-12-31
Morocco Installation Of A Cooling System For The Electrical Cabinets Of The Laayoune Diesel Power Plant 2025-12-31
South Africa Cancellation: Design, Manufacture, Procure, Installation, And Commissioning Of Duvha Power Station Effluent System Upgrade For A Period Of 22 (twenty-two) Months 2025-12-31
Malaysia The Supply, Delivery, Installation, Testing And Commissioning Of Sares Urgent Battery Replacement (lithium Ion) In Central Region, Sarawak 2025-12-31
Bangladesh Purchase Of 10 Kv Bank Online Ups Ip Backup Battery With Related Accessories 2025-12-31
Bangladesh Supply And Installation Of Electrical Equipment 2025-26 2025-12-31
India Single Core Elastomeric Cable Size 240 Sq. Mm, 1500 Volts As Per Rdso specification No. E/14/01 (rev.2) 1993 Part Ii. .#* Single Core Elastomeric Cable Size 240 Sq. Mm, 1500 Volts As Per Rdso Specif ication No. E/14/01 (rev.2) 1993 Part Ii. [ Warranty Per 2025-12-31
India Led Based Light Fitting Assembly Complete .#* Led Based Light Fitting Assembly Complete As Per Clw Specification No. Clw/es/l-22/alt f Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-31
India Rate Contract For Manufacture And Supply Of High Viscous Nylon-66 (hvn-66) Insulating liner To Rdso Drg. No.t-3707-3708 .#* Rate Contract For Manufacture And Supply Of High Viscous Nylon-66 (hvn-66) Insulating Liner To rdso Drg. No.t-3707-3708 (alt-8), Wi 2025-12-31
India Qta2 Relay .#* Qta2 Style Relay, Ac Immunized, 09 Ohms, 2f-1b Contact, Along With Plug Board (base Plate ), Connectors, Retaining Clips Etc. Conforming To Brs:939a & 966 (appx F2) And Irs:s-23, S-34 & 60. The Int erlocking Code For This Unit Shall Be Fghk 2025-12-31
Whats app