Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Cable-3gkw-0.5 Flex Red As Per Clws Spec. No.- Clw/es/3/0458 ( Alt.-e Or latest) For Wag9&wag7 Locos. .#* Cable-3gkw-0.5 Flex Red As Per Clws Spec. No.- Clw/es/3/0458 ( Alt.-e Or Latest) For W ag9&wag7 Locos. [ Warranty Period: 20 Months After The Date Of 2025-09-18
India Construction Work Of 132 Kv S/c Jobner- Bagru Rwan Line Overhead Line (25km) And Underground Cable (1.5km) With Opgw Of Complete Line Including Stringing Of Conductor, Detailed Route Survey, Laying And Installation Of Cable Alongwith Associated Line 2025-09-18
Lithuania Measures Of Synthesis Module 2025-09-18
Germany Öa 2025-0196 Electrical Installation Work 2025-09-18
Canada Scada System Upgrade - Phase 2 2025-09-18
India Provn Of Security Wall And Sentry Posts At Mankote Under Ge 881 Ews, Provn Of Security Wall And Sentry Posts At Mankote Under Ge 881 Ews, Total Amount Of Sch 'a' Part - Vi (external Electric Supply Work), Total Amount Of Sch 'a' Part - Ii (internla Electr 2025-09-18
-Reconstruction-Of-Center-Median-At-Km-0_0-2_325-Of-Thirumangalam-Mogappair-Road,-Reconstruction-Of-Center-Median-At-Km-0/0---2/325-Of-Thirumangalam---Mogappair-Road,-Manufacturing,-Supplying-And-Fixing-Of-St>India -Reconstruction-Of-Center-Median-At-Km-0_0-2_325-Of-Thirumangalam-Mogappair-Road,-Reconstruction-Of-Center-Median-At-Km-0/0---2/325-Of-Thirumangalam---Mogappair-Road,-Manufacturing,-Supplying-And-Fixing-Of-St>Tn.13/sl.no.02/ccr Ii /cridp Work 2025-26
Reconstruction Of Center Median At Km 0_0 2_325 Of Thirumangalam Mogappair Road, Reconstruction Of Center Median At Km 0/0 - 2/325 Of Thirumangalam - Mogappair Road, Manufacturing, Supplying And Fixing Of St
-Reconstruction-Of-Center-Median-At-Km-0_0-2_325-Of-Thirumangalam-Mogappair-Road,-Reconstruction-Of-Center-Median-At-Km-0/0---2/325-Of-Thirumangalam---Mogappair-Road,-Manufacturing,-Supplying-And-Fixing-Of-St>2025-09-18
-Construction-Of-Single-Living-In-Officer-Accn-At-Afs-Yelahanka,-Construction-Of-Single-Living-In-Officer-Accn-At-Afs-Yelahanka,-Material-And-Labour-For-Mild-Steel-Box-For-Telephon>India -Construction-Of-Single-Living-In-Officer-Accn-At-Afs-Yelahanka,-Construction-Of-Single-Living-In-Officer-Accn-At-Afs-Yelahanka,-Material-And-Labour-For-Mild-Steel-Box-For-Telephon>801674 Construction Of Single Living In Officer Accn At Afs Yelahanka
Construction Of Single Living In Officer Accn At Afs Yelahanka, Construction Of Single Living In Officer Accn At Afs Yelahanka, Material And Labour For Mild Steel Box For Telephon
-Construction-Of-Single-Living-In-Officer-Accn-At-Afs-Yelahanka,-Construction-Of-Single-Living-In-Officer-Accn-At-Afs-Yelahanka,-Material-And-Labour-For-Mild-Steel-Box-For-Telephon>2025-09-18
India Request For Selection Document For Setting Up Of 40 Mw/80mwh Standalone Battery Energy Storage Systems. 2025-09-18
South Africa The Design, Construction, Supply, Commissioning And Handover Of The Electrical Reticulation System For Grootvlei Climate Smart Horticulture Centre. 2025-09-18
Whats app