Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Estimate For 01 No 01 Kw Dlf Connection To Mukesh Taram S/o Shri Siya Ram Taram, (bp No 1010245049) At Dlf Connection 393/1 Sadak Para Kanker, Under Narharpur Dc Of O&m Dn Kanker.& Estimate For 01 No 01 Kw Dlf Connection To Santa Markam, (bp No 1010245046 2026-01-05
-Supply-Of-Vibrating-Screen-Assembly-With-Motor-For-Primary-Crusher-For-Coal-Handling-Plant-At-Wanakbori-Tps>India -Supply-Of-Vibrating-Screen-Assembly-With-Motor-For-Primary-Crusher-For-Coal-Handling-Plant-At-Wanakbori-Tps>Wanakbori Thermal Power Station
Supply Of Vibrating Screen Assembly With Motor For Primary Crusher For Coal Handling Plant At Wanakbori Tps
-Supply-Of-Vibrating-Screen-Assembly-With-Motor-For-Primary-Crusher-For-Coal-Handling-Plant-At-Wanakbori-Tps>2026-01-05
India Laying Of Underground Cable Network With Terminations In The Area Of Dgvcl Under All Scheme For All Sub Division Under Rander Division 2026-01-05
India Supply Of 6 Modular Surface Mounted Pvc Box Fitted With Following Items I) 6a Modular Piano Typeswitch Confirming To Is 3854/1997 3 Nos. Ii) 16a Modular Piano Type Switch Confirming To Is 3854/1997 1 No. Iii) 6/3 Pin, 16a Modular Socket Confirming To Is 1 2026-01-05
India Development Of Integrated Group Housing Facility At Lal Bahadur Shashtri Slum Quarters Tps 1 (jamalpur) Fp 86 On Ppp Basis Under Gujarat State Govts Redevelopment Of Public Housing Scheme 2016 2026-01-05
India Supply Of Rotary Limit Switches Suitable For Eot Cranes, Type Grls/48/2sh As Per Specification Details Attached At Annexure-a. Note: One Sample Should Be Got Approved Before Effecting Bulk Supply. [ Warranty Period: 30 Months After The Date Of Delivery ][ 2026-01-05
India Estimate For Load Enhancement From 90 Hp To 150 Hp Ip Connection Applied By M/s Adinath Chawal Udyog At Vllage Narayanpur Under Naryanpur (t) D/c. 2026-01-05
India Development Of Integrated Group Housing Facility At Ganj Shahid Municipal Quarters Tps 37 (danilimda) Fp 99 On Ppp Basis Under Gujarat State Govts Redevelopment Of Public Housing Scheme 2016 2026-01-05
India Estimate For Lt Power Supply Of 42 Hp Connection Of M/s I K R Bricks Prop. Shri Rahul Nand At Village Kharkharadih Of Naya Raipur Sub Division Under (o&m) Dn. Atal Nagar. 2026-01-05
India work Of Replacement Of Conventional Insulators By Sri For 400kv S/c Kasor-gpec Line [from Loc. No. 140 To 180 (9 Nos. Of Tension Loc.)] & Replacement Of Exist. Sri For 132kv Karjan-haldarwa Line With Buy Back Of Old Line Material (olm) Approved Under R&m 2026-01-05
Whats app