Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Silver Contact Heavy Duty For Qbca1 Relays .#* Silver Contact Heavy Duty For Qbca1 Relay To Drg.no.qbca 00411 Alt-1. [ Warranty Period : 30 Months After The Date Of Delivery ] ] 2026-01-05
India Haridasbur Benepukur Para(solar Light) A)thakurtala B) Near Icds.centec ) Benepukur Par D) Near House Of Babul Das, E) Near House Of Somai Murmu 2026-01-05
India Reading Light 2 Watt For Lhb Ac Chair .#* Reading Light 2 Watt For Lhb Ac Chair Car (3 Seater) , Type - Q2, Confirmng To rdso Spec No.rdso/pe/spec/tl/0091-2016 (rev.1) Rcf Annexure 1,2 & 3 Rcf Drawing No. Lw76 103, Alt-a. [ Warranty Period: 30 Months Afte 2026-01-05
India Switch Board Cabinet For Lwcbac .#* Switch Board Cabinet For Lhb Eog Ac Enhanced Capacity Hot Buffet Coaches To Spec. Edts-134, rev-d, Amd-1, 2, 3, 4 & 5, Cor-1 & 2 Or Latest With Additional Modification / Requirements As Per Schematic Diag ram For Power 2026-01-05
India Ss Cable Tie Rod Dia 8 Mm .#* Ss Cable Tie Rod Dia 8 Mm Aisi-304 [ Warranty Period: 30 Months After The Date Of delivery ] ] 2026-01-05
India Repairing Of 150(one Hundred Fifty) Nos Of Electric Streetlights In The Entire Area Of 187, Sikhira Champta Primary School 2026-01-05
India Installation Of 12 Nos. Of Solar Street Light Of 188 No Booth Area 2026-01-05
-Solar-Light-Installation-At-Multiple-Location-Sasthitala,-Deshali-Para-Bastutala,-Ma-Dasomotala-Saraswati-Para>India -Solar-Light-Installation-At-Multiple-Location-Sasthitala,-Deshali-Para-Bastutala,-Ma-Dasomotala-Saraswati-Para>Solar Light Installation At Multiple Location Sasthitala, Deshali Para, Bastutala, Ma Dasomotala, Saraswati Para
Solar Light Installation At Multiple Location Sasthitala, Deshali Para Bastutala, Ma Dasomotala Saraswati Para
-Solar-Light-Installation-At-Multiple-Location-Sasthitala,-Deshali-Para-Bastutala,-Ma-Dasomotala-Saraswati-Para>2026-01-05
-Improvement-Of-Lighting-System-At-6b,13a-Kalimuddin-Sarkar-Lane-In-Word-34.>India -Improvement-Of-Lighting-System-At-6b,13a-Kalimuddin-Sarkar-Lane-In-Word-34.>Ltg/78/apas/205/wd-34/25-26
Improvement Of Lighting System At 6b,13a Kalimuddin Sarkar Lane In Word-34.
-Improvement-Of-Lighting-System-At-6b,13a-Kalimuddin-Sarkar-Lane-In-Word-34.>2026-01-05
-Improvement-Of-Lighting-System-At-1/2-R.a.n-Singh-Lane,4-Rashmoni-Bazar-Road-In-Word-34.>India -Improvement-Of-Lighting-System-At-1/2-R.a.n-Singh-Lane,4-Rashmoni-Bazar-Road-In-Word-34.>Ltg/79/apas/206/wd-34/25-26
Improvement Of Lighting System At 1/2 R.a.n Singh Lane,4 Rashmoni Bazar Road In Word-34.
-Improvement-Of-Lighting-System-At-1/2-R.a.n-Singh-Lane,4-Rashmoni-Bazar-Road-In-Word-34.>2026-01-05
Whats app