Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Construction Of One Marriage Hall In Village Khiriya Guleli. (m.l.a-ramnagar) 2026-01-05
India Improvement Of Illumination With Steel Tubular Pole, Led Light Fittings At Subhas Pally Street No 3/3 Under Ward No- 19 Of Durgapur Municipal Corporation 2026-01-05
-Construction-And-Installation-Of-9.0-Mtr.-Hight-Electric-High-Mast-Light-Post-At-South-Jagtala-Mollapara-Para-Sadharan-Kabarsthan-At-Ward-No.---29-,-Under-Maheshtala-Municipality>India -Construction-And-Installation-Of-9.0-Mtr.-Hight-Electric-High-Mast-Light-Post-At-South-Jagtala-Mollapara-Para-Sadharan-Kabarsthan-At-Ward-No.---29-,-Under-Maheshtala-Municipality>Mplad 16
Construction And Installation Of 9.0 Mtr. Hight Electric High Mast Light Post At South Jagtala Mollapara Para Sadharan Kabarsthan At Ward No. - 29 , Under Maheshtala Municipality
-Construction-And-Installation-Of-9.0-Mtr.-Hight-Electric-High-Mast-Light-Post-At-South-Jagtala-Mollapara-Para-Sadharan-Kabarsthan-At-Ward-No.---29-,-Under-Maheshtala-Municipality>2026-01-05
-Repair-Of-Road-From-House-Of-Rinku-Dey-To-House-Of-Sidhu-Dey-250ft-X-8ft-Under-Hariharpur-Gp>India -Repair-Of-Road-From-House-Of-Rinku-Dey-To-House-Of-Sidhu-Dey-250ft-X-8ft-Under-Hariharpur-Gp>46/bps/2054 - E44/ 25-26 Sl10
Repair Of Road From House Of Rinku Dey To House Of Sidhu Dey 250ft X 8ft Under Hariharpur Gp
-Repair-Of-Road-From-House-Of-Rinku-Dey-To-House-Of-Sidhu-Dey-250ft-X-8ft-Under-Hariharpur-Gp>2026-01-05
-Construction-Pucca-Drain-From-Kabar-Sthan-Baro-Pukur-To-Petua-Madashra-Culvert-Under-Mallickpur-Gp>India -Construction-Pucca-Drain-From-Kabar-Sthan-Baro-Pukur-To-Petua-Madashra-Culvert-Under-Mallickpur-Gp>46/bps/2054 - E44/ 25-26 Sl2
Construction Pucca Drain From Kabar Sthan Baro Pukur To Petua Madashra Culvert Under Mallickpur Gp
-Construction-Pucca-Drain-From-Kabar-Sthan-Baro-Pukur-To-Petua-Madashra-Culvert-Under-Mallickpur-Gp>2026-01-05
India Construction Of Community Hall At Kellyapratappur Activity Id Apas/01/228/224/0001 2026-01-05
-Supplying-And-Commissioning-Of-Desktop,-Ups-(600-Va),-Laptop,-Colour-Printer-And-Colour-Photocopier-(annexure-I)-Under-Rusa-Project-In-College-Street-Campus,-University-Of-Calcutta.>India -Supplying-And-Commissioning-Of-Desktop,-Ups-(600-Va),-Laptop,-Colour-Printer-And-Colour-Photocopier-(annexure-I)-Under-Rusa-Project-In-College-Street-Campus,-University-Of-Calcutta.>R/431/25
Supplying And Commissioning Of Desktop, Ups (600 Va), Laptop, Colour Printer And Colour Photocopier (annexure I) Under Rusa Project In College Street Campus, University Of Calcutta.
-Supplying-And-Commissioning-Of-Desktop,-Ups-(600-Va),-Laptop,-Colour-Printer-And-Colour-Photocopier-(annexure-I)-Under-Rusa-Project-In-College-Street-Campus,-University-Of-Calcutta.>2026-01-05
-Contstructoin-Of-Drain-From-Sasanka-Mondal-House-To-Sardar-Para-Shib-Mandir-Under-Champahati-Gp>India -Contstructoin-Of-Drain-From-Sasanka-Mondal-House-To-Sardar-Para-Shib-Mandir-Under-Champahati-Gp>46/bps/2054 - E44/ 25-26 Sl5
Contstructoin Of Drain From Sasanka Mondal House To Sardar Para Shib Mandir Under Champahati Gp
-Contstructoin-Of-Drain-From-Sasanka-Mondal-House-To-Sardar-Para-Shib-Mandir-Under-Champahati-Gp>2026-01-05
India Construction Of 400 Kv Gis Substation And Associated Works On Turnkey Basis. Bus Reactor, 400 Kv Gis Bays, 132 Kv Gis Bays, Substation Automation System, Transformers, Galvanized Steel Structures, Acsr Twin Moose Conductor, Acsr Panther Conductor 2026-01-05
India Supply And Installation Of Governor And Excitation System Governor, Excitation. 2026-01-05
Whats app